i
AECOM
Filter interviews by
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
AECOM interview questions for designations
Top trending discussions
posted on 14 Jun 2024
I applied via LinkedIn and was interviewed in Feb 2024. There were 4 interview rounds.
How to manage site structure to finishing work
Technical/ mathematics
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
posted on 27 May 2024
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
based on 37 reviews
Rating in categories
Project Engineer
261
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
209
salaries
| ₹7.9 L/yr - ₹28 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹9.4 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley