i
AECOM
Filter interviews by
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
What people are saying about AECOM
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The unit weight of steel refers to the weight of a specific volume of steel.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot or 7850 kilograms per cubic meter.
On the other hand, the unit weight of sta...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 2 interviews
Interview experience
based on 22 reviews
Rating in categories
Project Engineer
233
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
198
salaries
| ₹7.7 L/yr - ₹24.5 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10.5 L/yr |
Associate Director
133
salaries
| ₹24 L/yr - ₹49 L/yr |
Architect
130
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis