I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
A pipe rack is a structure used to support pipes and other equipment in a plant or industrial facility.
Pipe racks are typically made of steel and are designed to withstand the weight of the pipes and equipment they support.
They are used to organize and route pipes throughout a facility, allowing for easy access and maintenance.
Pipe racks can be located indoors or outdoors, and can be designed to accommodate a variety o...
Headroom clearance is the vertical distance between the highest point of a piping system and the ceiling or any obstruction above it.
Headroom clearance is important to ensure safe and efficient installation and maintenance of piping systems.
It is typically specified in building codes and industry standards.
The required headroom clearance may vary depending on the type of piping system and its location.
For example, a st...
I applied via Recruitment Consulltant
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 12 Nov 2021
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 6 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
posted on 17 Feb 2024
I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.
based on 5 interviews
Interview experience
based on 17 reviews
Rating in categories
Senior Engineer
127
salaries
| ₹6.2 L/yr - ₹22 L/yr |
Process Engineer
125
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Principal Engineer
106
salaries
| ₹15 L/yr - ₹38 L/yr |
Piping Designer
105
salaries
| ₹3.7 L/yr - ₹12.8 L/yr |
Deputy Manager
95
salaries
| ₹7 L/yr - ₹23 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM