Filter interviews by
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.
HR technical department group discussion
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 34 reviews
Rating in categories
Senior Engineer
117
salaries
| ₹3.5 L/yr - ₹10.3 L/yr |
Civil Engineer
113
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Civil Site Engineer
100
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Site Engineer
91
salaries
| ₹2.4 L/yr - ₹6.2 L/yr |
Engineer
72
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Larsen & Toubro Limited
L&T Construction
Kalpataru Projects International
Nagarjuna Construction Company