I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences

I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. General civil engineering questions
  • Q2. Quality related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fresher join lot of learning regarding residential & commercial projects

Assistant Project Manager Interview Questions Asked at Other Companies

asked in Uflex
Q1. What are the different phases in new product development?
asked in JLL
Q2. Q1- What Is 456 Q2- Type of beam section Q3- What is Factor of sa ... read more
Q3. What activities are performed in the testing and commissioning of ... read more
Q4. What are the new technologies in Utilities that you have worked w ... read more
Q5. In case of Incomer failure how will you restore Auxiliary Supply

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Self introduction and roles and responsibilities of the previous company
  • Q2. Question related to safety and quality
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation with respect to previous salary
  • Q2. Benefits and facilities provided by the company
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the total experience
  • Q2. Your current CTC
Round 2 - Technical 

(2 Questions)

  • Q1. How much type of project
  • Q2. What was the memorable work
Round 3 - One-on-one 

(2 Questions)

  • Q1. Your Designation in this company
  • Q2. What is the look after
Round 4 - HR 

(2 Questions)

  • Q1. Your Notice period
  • Q2. Your expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - We have work on target base so that All work should be complete in time frame
And all Documents work should be complete according to work, otherwise your hard work is in vain.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. Role and responsiblity .
  • Q2. Good knowledge of working domain .
  • Q3. Efficient for team leading
  • Ans. 

    Efficient team leading requires clear communication, delegation, and motivation.

    • Establish clear goals and expectations

    • Delegate tasks based on team members' strengths

    • Provide regular feedback and recognition

    • Encourage open communication and collaboration

    • Lead by example and maintain a positive attitude

  • Answered by AI
  • Q4. Type of projects done in past exp and what were the outcomes

Interview Questionnaire 

2 Questions

  • Q1. Work experience
  • Q2. Explain about project worked and speicificatins,finicial

Ahluwalia Contracts India Interview FAQs

How many rounds are there in Ahluwalia Contracts India Assistant Project Manager interview?
Ahluwalia Contracts India interview process usually has 2 rounds. The most common rounds in the Ahluwalia Contracts India interview process are Resume Shortlist and Technical.
What are the top questions asked in Ahluwalia Contracts India Assistant Project Manager interview?

Some of the top questions asked at the Ahluwalia Contracts India Assistant Project Manager interview -

  1. Technical questions related to w...read more
  2. General civil engineering questi...read more
  3. Quality related questi...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 Ahluwalia Contracts India interviews
Company Website
100%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 688 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 127 Interviews
AtkinsRealis Interview Questions
4.0
 • 83 Interviews
View all
Ahluwalia Contracts India Assistant Project Manager Salary
based on 40 salaries
₹6 L/yr - ₹11.2 L/yr
7% less than the average Assistant Project Manager Salary in India
View more details

Ahluwalia Contracts India Assistant Project Manager Reviews and Ratings

based on 10 reviews

4.4/5

Rating in categories

3.9

Skill development

4.4

Work-Life balance

4.5

Salary & Benefits

4.5

Job Security

4.4

Company culture

4.4

Promotions/Appraisal

4.4

Work Satisfaction

Explore 10 Reviews and Ratings
Senior Engineer
154 salaries
unlock blur

₹3.5 L/yr - ₹9.4 L/yr

Civil Engineer
111 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Site Engineer
91 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Civil Site Engineer
74 salaries
unlock blur

₹1.8 L/yr - ₹5.8 L/yr

Engineer
69 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Ahluwalia Contracts India with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview