Q1. 2. What all are the points need to consider while preparing the site safety plan?
Points to consider while preparing site safety plan
Identify potential hazards and risks
Determine safety measures and protocols
Provide safety training to workers
Ensure proper safety equipment and gear
Establish emergency response procedures
Regular safety inspections and audits
Compliance with local and national safety regulations
Q2. What are key areas areas of concern or work out risk assessment which can delay the project
Key areas of concern in risk assessment for project delays
Unclear project scope or objectives
Inadequate resource allocation
Poor communication and collaboration among team members
Unforeseen technical challenges
External factors such as weather or regulatory changes
Budget constraints
Lack of contingency planning
Scope creep
Inefficient project management
Unrealistic timelines
Project Executive Engineer Interview Questions and Answers for Freshers
Q3. What is the latest engineering control you implemented in your previous projects?
Implemented a real-time monitoring system to track project progress and identify potential delays.
Developed a custom software to track project milestones and deadlines
Integrated the software with project management tools like Gantt charts and critical path analysis
Set up automated alerts for potential delays and risks
Regularly reviewed and analyzed the data to identify areas for improvement
Implemented corrective actions to mitigate delays and improve project efficiency
Q4. What all are the documents need to follow on construction site ?
Various documents are required on construction sites to ensure safety, compliance, and quality control.
Building permits and approvals
Construction drawings and specifications
Safety plans and hazard assessments
Inspection reports and quality control records
Material certifications and test reports
Change orders and project schedules
Daily logs and progress reports
Q5. 1000sqft slab estimate how many steel needs?
The amount of steel needed for a 1000sqft slab depends on the thickness of the slab and the spacing of the steel bars.
The thickness of the slab will determine the amount of steel needed.
The spacing of the steel bars will also affect the amount of steel needed.
A typical 4-inch thick slab may require around 100-120 steel bars per 1000sqft.
The size and type of steel bars used will also impact the amount needed.
Q6. Let me about what was more interesting subject in language
My most interesting subject in language was linguistics.
Studying the structure and evolution of languages
Analyzing phonetics and syntax
Comparing language families and dialects
Share interview questions and help millions of jobseekers 🌟
Q7. How to increase bearing capacity of a soil?
Bearing capacity of soil can be increased by improving soil compaction, adding reinforcement, or using ground improvement techniques.
Improving soil compaction by using heavy machinery or adding water to the soil
Adding reinforcement such as geotextiles or geogrids to increase soil strength
Using ground improvement techniques such as soil stabilization or deep soil mixing
Replacing weak soil with stronger soil or using piles to transfer the load to deeper, stronger soil
Reducing t...read more
Q8. How to purchase and maintaining the record?
To purchase and maintain records, a systematic approach is required.
Create a record-keeping system that is easy to use and understand.
Ensure that all records are accurate and up-to-date.
Regularly review and update records to ensure they are complete.
Store records in a secure location to prevent loss or damage.
Develop a purchasing system that is efficient and cost-effective.
Maintain a database of suppliers and their products to streamline the purchasing process.
Project Executive Engineer Jobs
Q9. What is the productivity of steel fitter per day
The productivity of a steel fitter per day varies depending on factors such as experience, complexity of the project, and work environment.
The productivity of a steel fitter can range from 4 to 8 hours of work per day.
Experienced steel fitters tend to be more productive than those with less experience.
The complexity of the project can affect productivity. More complex projects may require more time and effort.
The work environment, including factors like accessibility, safety ...read more
Q10. How to calculate sructural steel bar weight.
Structural steel bar weight can be calculated using the formula: weight = (d^2/162) * L, where d is the diameter of the bar in mm and L is the length of the bar in meters.
Calculate the cross-sectional area of the steel bar using the formula: Area = (π * d^2) / 4, where d is the diameter of the bar in mm.
Determine the weight of the steel bar by multiplying the cross-sectional area by the length of the bar and the density of steel (7850 kg/m^3).
Weight = Area * L * 7850
Q11. How can you manage people?
I can manage people by setting clear expectations, providing support and feedback, and fostering a positive work environment.
Establish clear goals and expectations
Provide regular feedback and support
Encourage open communication and collaboration
Recognize and reward good performance
Address conflicts and issues promptly and fairly
Q12. Why use in BMS (building management system)
BMS is essential for efficient monitoring and control of building systems.
Allows centralized control and monitoring of HVAC, lighting, security, and other systems
Improves energy efficiency by optimizing system performance
Enables proactive maintenance to prevent costly breakdowns
Enhances occupant comfort and safety
Provides data for analysis and decision-making to improve building operations
Q13. Where you see automotive market future
The automotive market is expected to witness significant growth in the future due to advancements in technology and changing consumer preferences.
Increasing demand for electric vehicles
Rapid development of autonomous driving technology
Growing focus on sustainability and environmental concerns
Integration of advanced connectivity features
Shift towards shared mobility services
Emerging markets becoming key players in the industry
Q14. What is your favourite colour??
My favorite color is blue.
Blue represents calmness and tranquility.
It is often associated with stability and trustworthiness.
Blue can also symbolize intelligence and wisdom.
Examples: the clear blue sky, the deep blue ocean.
Q15. What's code we should using for concrete
The code for concrete should be based on the specific project requirements and local building codes.
The code for concrete can vary depending on factors such as strength requirements, exposure conditions, and environmental considerations.
Common codes used for concrete include ACI 318 (Building Code Requirements for Structural Concrete) and ASTM C94 (Standard Specification for Ready-Mixed Concrete).
It is important to consult with structural engineers and local authorities to de...read more
Q16. Why development length is provide?
Development length is provided to ensure proper bonding between reinforcement and concrete.
Development length is the length of reinforcement bar required to transfer the stress from steel to concrete.
It is provided to ensure that the reinforcement bar is properly bonded with the concrete.
The development length depends on the diameter of the bar, the grade of the steel, and the strength of the concrete.
If the development length is not provided properly, it can lead to failure ...read more
Q17. What is BMS (building management system)
BMS is a system that controls and monitors building functions such as lighting, HVAC, security, and more.
BMS helps optimize energy usage and improve building efficiency.
It can integrate various systems like lighting, HVAC, security, and fire alarms for centralized control.
BMS can provide real-time data and analytics to help in decision-making for building management.
Examples of BMS vendors include Siemens, Honeywell, Johnson Controls.
Q18. Why we are using TMT bars
TMT bars are used in construction for their high tensile strength, ductility, and resistance to corrosion.
TMT bars have higher tensile strength compared to traditional mild steel bars, making them more suitable for construction of high-rise buildings and bridges.
They have good ductility, allowing them to bend without breaking during earthquakes or other natural disasters.
TMT bars are resistant to corrosion, ensuring the longevity and durability of the structure.
They are cost-...read more
Q19. What is full form of TMT bar
Thermo-Mechanically Treated bar
TMT bar stands for Thermo-Mechanically Treated bar
TMT bars are high-strength reinforcement bars having a tough outer core and a soft inner core
They are widely used in construction for their superior strength and ductility
Q20. What is use of spirit level
A spirit level is used to determine if a surface is level or plumb.
Used in construction to ensure buildings are level
Helps in installing shelves, cabinets, and other fixtures accurately
Used in carpentry to ensure straight and level cuts
Also known as a bubble level due to the liquid-filled tube with a bubble inside
Q21. Normal process of putty work in a room ?
Putty work involves filling gaps and cracks in walls to create a smooth surface for painting or wallpapering.
Clean the surface to be puttied
Apply putty to the gaps and cracks using a putty knife
Smooth out the putty with a wet sponge or sandpaper
Allow the putty to dry completely before painting or wallpapering
Repeat the process if necessary for a smooth finish
Q22. What is soil stabilization?
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to improve its properties
Common materials used for soil stabilization include cement, lime, and fly ash
Soil stabilization is often used in construction projects to improve the stability of the ground
It can also be used to prevent soil erosion and improve the load-bearing capacity of the soil
Soil stabilization techni...read more
Q23. 5. What is Development length?
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the stress.
It depends on the diameter of the bar, type of concrete, and the bond strength between steel and concrete.
It is calculated using the formula Ld = (φ × fy × As) / (4 × τbd × σst)
For example, for a 20mm diameter bar in M25 grade concrete, the development length is 44cm.
It is im...read more
Q24. What use in PC-200 controller?
The PC-200 controller is used for controlling and monitoring various processes in industrial automation.
The PC-200 controller is commonly used in industrial automation for tasks such as controlling machinery, monitoring processes, and collecting data.
It can be programmed to perform specific functions based on input from sensors and other devices.
The PC-200 controller is often used in manufacturing plants, power plants, and other industrial settings.
Examples of applications in...read more
Q25. Which tools you used ?
I have used various tools such as Microsoft Project, JIRA, Trello, and Asana for project management and collaboration.
Microsoft Project for project planning and scheduling
JIRA for issue tracking and agile project management
Trello for task management and collaboration
Asana for team communication and project tracking
Q26. What is puff panel?
Puff panel is a type of insulated panel made of two metal sheets with a foam core in between.
Puff panels are commonly used in construction for walls, roofs, and ceilings.
They provide excellent insulation and are lightweight, making them easy to install.
Puff panels are also fire-resistant and have good sound insulation properties.
Examples of applications include cold storages, clean rooms, and industrial buildings.
Q27. Modular Bricks dimensions?
Modular bricks come in various dimensions depending on the manufacturer and intended use.
Modular bricks are typically 3 5/8 inches tall by 2 1/4 inches wide by 7 5/8 inches long.
Other common sizes include 2 1/4 x 3 5/8 x 7 5/8 inches and 2 1/4 x 3 5/8 x 11 5/8 inches.
Some manufacturers may offer custom sizes or shapes for specific projects.
The dimensions of modular bricks are important for determining the amount needed for a project and for ensuring proper installation.
Q28. What is BOQ?
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is a detailed document that helps in estimating the cost of a construction project.
It includes a list of all the materials, equipment, and labor required for the project.
BOQ is prepared by a quantity surveyor or an estimator.
It helps in comparing the actual cost of the project with the estimated cost.
BOQ is an important document for t...read more
Q29. Dimensions of a Cement Bag?
A cement bag typically measures 20 inches in height, 16 inches in width, and 4 inches in depth.
The dimensions of a cement bag may vary slightly depending on the manufacturer.
The weight of a cement bag is usually 50 kg or 110 lbs.
Cement bags are made of paper or plastic and are designed to be durable and moisture-resistant.
Q30. what is modicon 2340
Modicon 2340 is a programmable logic controller (PLC) used for industrial automation.
Modicon 2340 is a type of PLC used for automation in industries such as manufacturing, energy, and transportation.
It is designed to control and monitor various processes and equipment in an industrial setting.
The Modicon 2340 offers advanced features such as high-speed processing, multiple communication protocols, and flexible programming options.
It is a reliable and durable solution for indu...read more
Q31. Difference between ss316 and ss304
SS316 has higher corrosion resistance and strength than SS304.
SS316 contains molybdenum which enhances its corrosion resistance
SS316 is more expensive than SS304
SS304 is commonly used in household appliances while SS316 is used in marine and chemical industries
Q32. Why use in BMS
BMS is used for centralized monitoring and control of building systems.
Centralized monitoring and control of HVAC systems
Energy management and optimization
Fault detection and diagnostics
Integration with other building systems like lighting and security
Remote access and control for facility managers
Q33. 1)boiler erection details.
Boiler erection details involve the process of assembling and installing a boiler system.
Boiler erection includes preparing the foundation and setting up the boiler structure.
The boiler components are then installed, such as the pressure parts, tubes, and fittings.
Piping systems for fuel, water, and steam are connected to the boiler.
Electrical and control systems are integrated into the boiler.
Insulation and lagging are applied to the boiler to minimize heat loss.
Finally, tes...read more
Q34. Micro irrigation Design
Micro irrigation design involves the use of small amounts of water to irrigate crops efficiently.
Micro irrigation systems use low pressure and low volume to deliver water directly to the roots of plants.
Drip irrigation and micro-sprinklers are common types of micro irrigation systems.
Design considerations include soil type, crop type, water quality, and topography.
Proper design can lead to water savings, increased crop yields, and reduced labor costs.
Q35. Thickness of glass in glr
The thickness of glass in GLR varies depending on the manufacturer and intended use.
The thickness of glass in GLR can range from 3mm to 12mm.
The thickness of glass is determined by the size of the GLR and the pressure it will be subjected to.
The type of glass used in GLR can also affect its thickness.
Thicker glass is typically used in GLR that will be subjected to higher pressures or temperatures.
Consult the manufacturer's specifications for the recommended thickness of glass...read more
Q36. Material properties
Material properties refer to the characteristics of a material that determine its behavior under specific conditions.
Material properties include mechanical, thermal, electrical, and chemical properties.
Examples of material properties are strength, hardness, conductivity, and reactivity.
Understanding material properties is crucial for selecting the right materials for a project.
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month