Filter interviews by
I was interviewed in Jul 2024.
I am a dedicated and experienced Site Engineer with a strong background in construction management.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including commercial buildings and residential complexes.
I am proficient in using AutoCAD and other construction software.
I have excellent communication and problem-solving skills, which help me coordinate w
Working of power transformer
Power factor of an alternator is a measure of how effectively it converts mechanical power into electrical power.
Power factor is the cosine of the angle between the voltage and current waveforms in an AC circuit.
It indicates the phase difference between voltage and current and ranges from 0 to 1.
A power factor of 1 means the alternator is operating at maximum efficiency.
A lagging power factor (less than 1) indicates th...
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the c
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in struct
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing mat
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensi...
How to work with us?
Kalpataru Projects International interview questions for designations
I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.
Get interview-ready with Top Kalpataru Projects International Interview Questions
Checklist for starting excavation work
Obtain necessary permits and approvals
Ensure proper marking and surveying of excavation area
Identify and mark underground utilities
Ensure proper safety measures are in place
Inspect excavation equipment and tools
Ensure proper disposal of excavated materials
Monitor weather conditions
Ensure proper communication and coordination with stakeholders
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
Top trending discussions
Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.
Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.
Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.
Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.
Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...
posted on 15 Jun 2024
posted on 16 Jun 2024
based on 6 interviews
1 Interview rounds
based on 42 reviews
Rating in categories
Deputy Manager
574
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Senior Engineer
554
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Assistant Manager
545
salaries
| ₹3.8 L/yr - ₹16 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
241
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power