Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
Feedback Infrastructure Services interview questions for popular designations
I applied via Company Website and was interviewed before Dec 2023. There were 3 interview rounds.
Get interview-ready with Top Feedback Infrastructure Services Interview Questions
I applied via Naukri.com and was interviewed before Oct 2023. There was 1 interview round.
I am a dedicated highway engineer with 5 years of experience in designing and managing road construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various highway projects, including the design of a new interchange on Highway 101.
I am proficient in using AutoCAD and other design software for highway engineering.
I have experience in managing project budgets and timelin...
The maximum grade in vertical design refers to the steepest slope that can be used in designing a highway or road.
The maximum grade in vertical design is typically around 6% for highways and major roads.
Steep grades can increase the risk of accidents and make it difficult for vehicles to maintain speed.
Designers must consider factors such as visibility, vehicle performance, and safety when determining the maximum grade...
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
I have 5 years of experience in designing and constructing transmission lines.
Designed and implemented transmission line projects for various clients
Managed construction activities and ensured compliance with safety regulations
Performed inspections and quality control checks on transmission line installations
Collaborated with team members and stakeholders to ensure project success
Steel Binding BBS making involves creating a detailed schedule of steel reinforcement as per approved drawings.
Review the approved drawings to understand the required steel reinforcement layout
Calculate the quantity of steel bars needed for each section of the structure
Prepare a detailed Bar Bending Schedule (BBS) showing the shape, size, and placement of each steel bar
Ensure that the BBS complies with the design speci...
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
I applied via Recruitment Consulltant
Top trending discussions
Some of the top questions asked at the Feedback Infrastructure Services interview -
The duration of Feedback Infrastructure Services interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 22 interviews
Interview experience
based on 775 reviews
Rating in categories
Field Engineer
107
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
102
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Senior Engineer
83
salaries
| ₹3.6 L/yr - ₹10.2 L/yr |
Site Engineer
51
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Junior Engineer
43
salaries
| ₹2.6 L/yr - ₹6.5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
KEC International