Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2021. There was 1 interview round.
posted on 20 Jul 2017
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 16 May 2021
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
RCC structure is a reinforced concrete structure that uses steel bars to reinforce concrete.
RCC structures are commonly used in buildings, bridges, and other structures.
The design of RCC structures is governed by various codes such as IS 456:2000.
RCC structures are designed to withstand various loads such as dead load, live load, wind load, and earthquake load.
The construction of an RCC structure involves various steps...
posted on 1 Sep 2021
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
If casing gets trapped after concreting, I would follow these steps to resolve the issue.
Assess the situation and determine the cause of the casing getting trapped
If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools
If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out
Consult with experienced professionals or engineers fo...
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 9 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 review
Rating in categories
Field Engineer
107
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company