Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2019. There was 1 interview round.
I completed my IT degree in 2018. My major project was a web application for a local business, and my minor project was a mobile app for a school.
Completed IT degree in 2018
Major project: Web application for a local business
Minor project: Mobile app for a school
Top trending discussions
posted on 30 Dec 2024
posted on 30 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
posted on 26 Aug 2024
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
posted on 30 Dec 2024
posted on 30 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
posted on 26 Aug 2024
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
posted on 4 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 54 reviews
Rating in categories
Field Engineer
107
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
102
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Senior Engineer
65
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Site Engineer
51
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Junior Engineer
43
salaries
| ₹2.6 L/yr - ₹6.5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
KEC International