Feedback Infrastructure Services Field Engineer Interview Questions and Answers

Updated 10 Apr 2020

Feedback Infrastructure Services Field Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Oct 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. *is which year u completed it degree *What is ur Minor and major project
  • Ans. 

    I completed my IT degree in 2018. My major project was a web application for a local business, and my minor project was a mobile app for a school.

    • Completed IT degree in 2018

    • Major project: Web application for a local business

    • Minor project: Mobile app for a school

  • Answered by AI
  • Q2. I have answered their questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be panic. Be confident.say what u understand and know.. don't talk any bullshit.if u don't know then simply say I don't know

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Engineering related questions.and education related questions
Round 2 - HR 

(1 Question)

  • Q1. About yourself and sailary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Frequency of cube casting & testing per cubic meter
  • Ans. 

    The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

    • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

    • In general, cube casting and testing may be done at regular intervals during the construction process.

    • For example, in a large construction project, cube casting and testing may be d...

  • Answered by AI
  • Q2. PEB structure Erection process
  • Q3. Rate analysis of each items of construction
  • Ans. 

    Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

    • Rate analysis helps in estimating the total cost of a construction project.

    • It involves breaking down the project into various activities and determining the cost of each activity.

    • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...

  • Answered by AI
  • Q4. Testing of concrete, sieve analysis fine aggregates, course aggregates
  • Q5. Tremix flooring process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed & confident during interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. All about your resume .
  • Q2. Why you want to change job
  • Ans. 

    Seeking new challenges and opportunities for growth in a different environment.

    • Desire for career advancement

    • Seeking new challenges

    • Opportunity for growth

    • Change in work environment

  • Answered by AI
  • Q3. Reloaction related
  • Q4. Work experience and my past companies job responsbility
Round 2 - Technical 

(10 Questions)

  • Q1. Questions from Is code 456
  • Q2. Acceptance criteria of cube
  • Ans. 

    Acceptance criteria of cube includes dimensions, material, weight, and quality standards.

    • Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)

    • Material should be durable and suitable for intended use (e.g. plastic, wood, metal)

    • Weight should be within acceptable range based on material and size

    • Quality standards must be met in terms of finish, edges, and overall construction

  • Answered by AI
  • Q3. Colomn cover tolerance
  • Q4. Stripping time of shutterings
  • Ans. 

    Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.

    • Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.

    • For example, timber formwork may require longer stripping time compared to steel formwork.

    • In hot weather, concrete may set faster, reducing the stripping time.

    • Proper curing can also affec...

  • Answered by AI
  • Q5. Construction Materials and there site test
  • Q6. Design mix questions
  • Q7. Quality related questions of concrete
  • Q8. Is code 1200 for billing purpose
  • Ans. 

    Code 1200 is not specifically for billing purposes.

    • Code 1200 is typically used in reference to a specific task or action, not billing.

    • It could be related to a specific product, service, or process within a company.

    • For example, code 1200 might indicate a specific troubleshooting step in a technical manual.

  • Answered by AI
  • Q9. Manpower output for works like shuttering,steel,blockwork,plaster etc
  • Ans. 

    Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.

    • Manpower output for shuttering can range from 10-20 sqm per day depending on complexity

    • Steelwork output can vary from 50-100 kg per worker per day

    • Blockwork output can range from 50-100 blocks per worker per day

    • Plastering output can vary from 10-20 sqm per worker per day

    • Fact...

  • Answered by AI
  • Q10. Last question was about my salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever the work you are doing you have to deep knowledege about there tests, codes, etc and focus on is codes like 456 ,1200
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Engineering related questions.and education related questions
Round 2 - HR 

(1 Question)

  • Q1. About yourself and sailary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Frequency of cube casting & testing per cubic meter
  • Ans. 

    The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

    • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

    • In general, cube casting and testing may be done at regular intervals during the construction process.

    • For example, in a large construction project, cube casting and testing may be d...

  • Answered by AI
  • Q2. PEB structure Erection process
  • Q3. Rate analysis of each items of construction
  • Ans. 

    Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

    • Rate analysis helps in estimating the total cost of a construction project.

    • It involves breaking down the project into various activities and determining the cost of each activity.

    • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...

  • Answered by AI
  • Q4. Testing of concrete, sieve analysis fine aggregates, course aggregates
  • Q5. Tremix flooring process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed & confident during interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. All about your resume .
  • Q2. Why you want to change job
  • Ans. 

    Seeking new challenges and opportunities for growth in a different environment.

    • Desire for career advancement

    • Seeking new challenges

    • Opportunity for growth

    • Change in work environment

  • Answered by AI
  • Q3. Reloaction related
  • Q4. Work experience and my past companies job responsbility
Round 2 - Technical 

(10 Questions)

  • Q1. Questions from Is code 456
  • Q2. Acceptance criteria of cube
  • Ans. 

    Acceptance criteria of cube includes dimensions, material, weight, and quality standards.

    • Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)

    • Material should be durable and suitable for intended use (e.g. plastic, wood, metal)

    • Weight should be within acceptable range based on material and size

    • Quality standards must be met in terms of finish, edges, and overall construction

  • Answered by AI
  • Q3. Colomn cover tolerance
  • Q4. Stripping time of shutterings
  • Ans. 

    Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.

    • Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.

    • For example, timber formwork may require longer stripping time compared to steel formwork.

    • In hot weather, concrete may set faster, reducing the stripping time.

    • Proper curing can also affec...

  • Answered by AI
  • Q5. Construction Materials and there site test
  • Q6. Design mix questions
  • Q7. Quality related questions of concrete
  • Q8. Is code 1200 for billing purpose
  • Ans. 

    Code 1200 is not specifically for billing purposes.

    • Code 1200 is typically used in reference to a specific task or action, not billing.

    • It could be related to a specific product, service, or process within a company.

    • For example, code 1200 might indicate a specific troubleshooting step in a technical manual.

  • Answered by AI
  • Q9. Manpower output for works like shuttering,steel,blockwork,plaster etc
  • Ans. 

    Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.

    • Manpower output for shuttering can range from 10-20 sqm per day depending on complexity

    • Steelwork output can vary from 50-100 kg per worker per day

    • Blockwork output can range from 50-100 blocks per worker per day

    • Plastering output can vary from 10-20 sqm per worker per day

    • Fact...

  • Answered by AI
  • Q10. Last question was about my salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever the work you are doing you have to deep knowledege about there tests, codes, etc and focus on is codes like 456 ,1200
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. All about your studies and experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through your resume

Feedback Infrastructure Services Interview FAQs

How to prepare for Feedback Infrastructure Services Field Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Feedback Infrastructure Services. The most common topics and skills that interviewers at Feedback Infrastructure Services expect are Land Acquisition, Electrical Engineering, Electronics Engineering, site acquisition and AutoCAD.

Tell us how to improve this page.

Feedback Infrastructure Services Field Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

KEC International Interview Questions
4.0
 • 295 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.2
 • 109 Interviews
View all
Feedback Infrastructure Services Field Engineer Salary
based on 107 salaries
₹1.5 L/yr - ₹4.5 L/yr
38% less than the average Field Engineer Salary in India
View more details

Feedback Infrastructure Services Field Engineer Reviews and Ratings

based on 54 reviews

3.9/5

Rating in categories

3.4

Skill development

3.6

Work-life balance

3.1

Salary

3.0

Job security

3.7

Company culture

3.1

Promotions

3.3

Work satisfaction

Explore 54 Reviews and Ratings
Field Engineer
107 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Assistant Manager
102 salaries
unlock blur

₹3 L/yr - ₹9.8 L/yr

Senior Engineer
65 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Site Engineer
51 salaries
unlock blur

₹2 L/yr - ₹5.6 L/yr

Junior Engineer
43 salaries
unlock blur

₹2.6 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Feedback Infrastructure Services with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.2
Compare

KEC International

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview