Filter interviews by
Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
I applied via Walk-in and was interviewed before Sep 2020. There were 4 interview rounds.
Camber is the upward curve given to a road or bridge surface to counteract the effects of gravity and prevent sagging.
Camber is a slight upward curve given to a road or bridge surface.
It is used to counteract the effects of gravity and prevent sagging.
Camber is also used in racing cars to improve handling and stability.
The amount of camber required depends on the design and purpose of the road or bridge.
Camber can be p...
Top trending discussions
posted on 19 Feb 2021
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
posted on 27 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 4 Apr 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrigation...
posted on 17 Nov 2022
I applied via Job Fair and was interviewed before Nov 2021. There was 1 interview round.
A WTP flow diagram shows the process of water treatment and purification.
The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.
Screens remove large debris and particles from the water.
Sedimentation tanks allow suspended particles to settle to the bottom.
Filters remove smaller particles and impurities.
Disinfection units use chemicals or UV light to kill bact...
posted on 30 Jun 2022
I applied via Referral and was interviewed in May 2022. There were 4 interview rounds.
Question related to civil engineering
Civil site engineers are responsible for overseeing construction projects and ensuring they meet safety and quality standards.
Supervising construction projects
Ensuring compliance with safety and quality standards
Collaborating with architects and contractors
Managing budgets and timelines
Performing site inspections and surveys
Preparing reports and documentation
Assignment of any RCC work which done on site.
posted on 4 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.
posted on 20 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
posted on 3 Jun 2023
I applied via Company Website and was interviewed in May 2023. There were 3 interview rounds.
Unseen problems in civil engineering projects require critical thinking, problem-solving skills, and collaboration with team members.
Identify the root cause of the problem
Brainstorm potential solutions with team members
Consider the impact of each solution on the project timeline and budget
Implement the most feasible solution and monitor its effectiveness
Document the problem-solving process for future reference
I have 5 years of experience working as a Civil Site Engineer.
Worked on various construction projects including residential, commercial, and industrial buildings.
Managed site operations, supervised construction activities, and ensured compliance with safety regulations.
Collaborated with architects, contractors, and clients to ensure project requirements were met.
Performed site inspections, quality control checks, and r...
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Assistant Manager
102
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Senior Engineer
65
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Site Engineer
51
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Field Engineer
46
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Civil Engineer
44
salaries
| ₹2.2 L/yr - ₹8.5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company