Overlap refers to the area where two or more elements share common space or features.
Overlap occurs when two or more elements occupy the same physical space or have common characteristics.
In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.
Overlap can also occur in surveying when two survey lines intersect or overlap each other.
Prop...
Overlapping in civil engineering is done to ensure proper continuity and strength in construction.
Overlapping is done to ensure continuity of reinforcement bars in concrete structures.
It helps in distributing the load evenly and prevents sudden failure.
Overlapping also helps in providing the required strength to the structure.
Proper overlapping ensures that the structure can withstand various stresses and forces.
For ex...
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Field process refers to the activities and procedures carried out on-site during construction or maintenance of civil engineering projects.
Field process involves site preparation, excavation, foundation construction, structural erection, and finishing works.
It includes quality control inspections, material testing, and adherence to safety regulations.
Field process also involves coordination with subcontractors, supplie...
A transmission line is a specialized cable or other structure designed to carry electrical signals over long distances with minimal loss.
Transmits electrical signals over long distances
Minimizes signal loss
Used in telecommunications, power distribution, and networking
Examples include overhead power lines and fiber optic cables
I was interviewed before Jan 2024.
Megha Engineering & Infrastructures interview questions for designations
Cement is a binding agent used in construction, while concrete is a mixture of cement, water, aggregates, and sometimes additives.
Cement is a fine powder made from limestone, clay, and other minerals.
Concrete is a composite material made by mixing cement, water, aggregates (such as sand or gravel), and sometimes additives like fly ash or fibers.
Cement is used to bind materials together in construction, while concrete i...
Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Building construction process involves planning, designing, permitting, and construction phases.
Planning phase includes site selection, feasibility studies, and budgeting.
Designing phase involves architectural and structural design.
Permitting phase requires obtaining necessary approvals and permits from local authorities.
Construction phase includes site preparation, foundation work, structural framing, and finishing.
Qu...
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For earth...
Top trending discussions
Some of the top questions asked at the Megha Engineering & Infrastructures Civil Site Engineer interview -
The duration of Megha Engineering & Infrastructures Civil Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 14 interviews
2 Interview rounds
based on 93 reviews
Rating in categories
Engineer
901
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
850
salaries
| ₹3.2 L/yr - ₹11.5 L/yr |
Associate Manager
493
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
407
salaries
| ₹2.1 L/yr - ₹9 L/yr |
Civil Engineer
354
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company