A site engineer is responsible for overseeing construction projects, ensuring they are completed on time, within budget, and meet quality standards.
Responsible for planning, coordinating, and supervising construction projects
Ensure projects are completed on time and within budget
Monitor quality standards and compliance with regulations
Collaborate with architects, contractors, and other stakeholders
Resolve any issu...
Re-block is the process of dividing a large land parcel into smaller blocks, while palnes are the boundaries of these smaller blocks.
Re-block involves dividing a large land parcel into smaller blocks for development purposes.
Palnes are the boundaries that separate these smaller blocks.
Re-block is a planning and zoning term used in urban development.
Palnes help define property lines and ownership within the divided...
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For ...
Field process refers to the activities and procedures carried out on-site during construction or maintenance of civil engineering projects.
Field process involves site preparation, excavation, foundation construction, structural erection, and finishing works.
It includes quality control inspections, material testing, and adherence to safety regulations.
Field process also involves coordination with subcontractors, su...
A transmission line is a specialized cable or other structure designed to carry electrical signals over long distances with minimal loss.
Transmits electrical signals over long distances
Minimizes signal loss
Used in telecommunications, power distribution, and networking
Examples include overhead power lines and fiber optic cables
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes used in construction.
BBS is essential for ensuring the correct quantity and placement of reinforcement bars in concrete structures.
It helps in estimating the required amount of steel reinforcement accurately.
BBS also aids in reducing wastage of materials and labor costs.
It is crucial for maintaining th...
To calculate the quantity of cement, sand, and aggregate for 1 cu.m concrete, you need to know the mix ratio and bulk density of materials.
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the volume of concrete required (1 cu.m in this case)
Calculate the quantity of cement, sand, and aggregate using the mix ratio and bulk density of materials
For example, if the mix ratio is 1:2:4...
The weight of 16 mm dia steel of 1 m length is 1.58 kg.
The weight of steel can be calculated using the formula: weight = (d^2/162) * L, where d is the diameter in mm and L is the length in meters.
Substituting the values, we get weight = (16^2/162) * 1 = 1.58 kg.
This weight is for mild steel. The weight may vary for other types of steel.
The weight of steel is an important factor in construction and design calculati...
A WTP flow diagram shows the process of water treatment and purification.
The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.
Screens remove large debris and particles from the water.
Sedimentation tanks allow suspended particles to settle to the bottom.
Filters remove smaller particles and impurities.
Disinfection units use chemicals or UV light to kill...
I applied via Campus Placement
Overlap refers to the area where two or more elements share common space or features.
Overlap occurs when two or more elements occupy the same physical space or have common characteristics.
In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.
Overlap can also occur in surveying when two survey lines intersect or overlap each other.
Prop...
Overlapping in civil engineering is done to ensure proper continuity and strength in construction.
Overlapping is done to ensure continuity of reinforcement bars in concrete structures.
It helps in distributing the load evenly and prevents sudden failure.
Overlapping also helps in providing the required strength to the structure.
Proper overlapping ensures that the structure can withstand various stresses and forces.
For ex...
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Field process refers to the activities and procedures carried out on-site during construction or maintenance of civil engineering projects.
Field process involves site preparation, excavation, foundation construction, structural erection, and finishing works.
It includes quality control inspections, material testing, and adherence to safety regulations.
Field process also involves coordination with subcontractors, supplie...
A transmission line is a specialized cable or other structure designed to carry electrical signals over long distances with minimal loss.
Transmits electrical signals over long distances
Minimizes signal loss
Used in telecommunications, power distribution, and networking
Examples include overhead power lines and fiber optic cables
I appeared for an interview before Jan 2024.
A site engineer is responsible for overseeing construction projects, ensuring they are completed on time, within budget, and meet quality standards.
Responsible for planning, coordinating, and supervising construction projects
Ensure projects are completed on time and within budget
Monitor quality standards and compliance with regulations
Collaborate with architects, contractors, and other stakeholders
Resolve any issues or...
Re-block is the process of dividing a large land parcel into smaller blocks, while palnes are the boundaries of these smaller blocks.
Re-block involves dividing a large land parcel into smaller blocks for development purposes.
Palnes are the boundaries that separate these smaller blocks.
Re-block is a planning and zoning term used in urban development.
Palnes help define property lines and ownership within the divided land...
Cement is a binding agent used in construction, while concrete is a mixture of cement, water, aggregates, and sometimes additives.
Cement is a fine powder made from limestone, clay, and other minerals.
Concrete is a composite material made by mixing cement, water, aggregates (such as sand or gravel), and sometimes additives like fly ash or fibers.
Cement is used to bind materials together in construction, while concrete i...
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
I am passionate about civil engineering and eager to contribute to impactful projects that enhance infrastructure and community development.
I have a strong foundation in civil engineering principles, demonstrated through my academic projects and internships.
I am excited about the opportunity to work on large-scale infrastructure projects, such as bridges and highways, which can improve community connectivity.
I thrive i...
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Building construction process involves planning, designing, permitting, and construction phases.
Planning phase includes site selection, feasibility studies, and budgeting.
Designing phase involves architectural and structural design.
Permitting phase requires obtaining necessary approvals and permits from local authorities.
Construction phase includes site preparation, foundation work, structural framing, and finishing.
Qu...
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For earth...
Top trending discussions
Some of the top questions asked at the Megha Engineering & Infrastructures Civil Site Engineer interview -
The duration of Megha Engineering & Infrastructures Civil Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interview experiences
Difficulty level
Duration
based on 101 reviews
Rating in categories
Engineer
990
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Senior Engineer
874
salaries
| ₹4.1 L/yr - ₹9.2 L/yr |
Associate Manager
542
salaries
| ₹6 L/yr - ₹13.7 L/yr |
Mechanical Engineer
403
salaries
| ₹2.4 L/yr - ₹6.9 L/yr |
Store Executive
358
salaries
| ₹2.1 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies