Megha Engineering & Infrastructures Civil Site Engineer Interview Questions, Process, and Tips

Updated 28 Jan 2025

Top Megha Engineering & Infrastructures Civil Site Engineer Interview Questions and Answers

View all 14 questions

Megha Engineering & Infrastructures Civil Site Engineer Interview Experiences

17 interviews found

Round 1 - Technical 

(3 Questions)

  • Q1. Civil releted . Structure Archetec (finishing)
  • Q2. Quality releted All types shuttering Good quality On time to time complete target cedule Good understanding with communication team work Quality control with contractor controlling .
  • Q3. Each and every steps I will stand for our work

Interview Preparation Tips

Interview preparation tips for other job seekers - I m Shakil Ahmad I'm from Patna India I m civil Engineer 7 year Experience in High rise building construction, Residential and commercial WTP pipe line shuttering liva peri deo RMDK formwork so I am interested job this company if u can help me then I am very happy .
Mb no :- XXXXX
Shakil Ahmad
Date :- 16/09/2022
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is bbs and uses
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes used in construction.

    • BBS is essential for ensuring the correct quantity and placement of reinforcement bars in concrete structures.

    • It helps in estimating the required amount of steel reinforcement accurately.

    • BBS also aids in reducing wastage of materials and labor costs.

    • It is crucial for maintaining the str...

  • Answered by AI
  • Q2. How to calculate qty of cement sand and aggregate for 1 cu.m concrete
  • Ans. 

    To calculate the quantity of cement, sand, and aggregate for 1 cu.m concrete, you need to know the mix ratio and bulk density of materials.

    • Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)

    • Calculate the volume of concrete required (1 cu.m in this case)

    • Calculate the quantity of cement, sand, and aggregate using the mix ratio and bulk density of materials

    • For example, if the mix ratio is 1:2:4 and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic construction materials knowledge is very important

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. 16 mm dia steel weight 1 m
  • Ans. 

    The weight of 16 mm dia steel of 1 m length is 1.58 kg.

    • The weight of steel can be calculated using the formula: weight = (d^2/162) * L, where d is the diameter in mm and L is the length in meters.

    • Substituting the values, we get weight = (16^2/162) * 1 = 1.58 kg.

    • This weight is for mild steel. The weight may vary for other types of steel.

    • The weight of steel is an important factor in construction and design calculations.

  • Answered by AI
  • Q2. M-20 grade con. 1 cum weight
  • Ans. 

    M-20 grade concrete weighs approximately 2400 kg per cubic meter.

    • M-20 grade concrete is a commonly used grade of concrete in construction.

    • The weight of M-20 grade concrete is determined by the density of its components.

    • The components of M-20 grade concrete include cement, sand, and coarse aggregates.

    • The weight of each component and their proportions determine the overall weight of 1 cubic meter of M-20 grade concrete.

    • T...

  • Answered by AI
  • Q3. Concrete mini.to max slup
  • Ans. 

    Concrete slump is the measure of consistency and workability of concrete.

    • Slump test is conducted to determine the consistency of freshly mixed concrete.

    • The minimum slump for concrete used in road construction is 25-50 mm.

    • The maximum slump for concrete used in heavily reinforced structures is 100-150 mm.

    • The slump value can be adjusted by adding water or admixtures to the concrete mix.

    • A higher slump value indicates a mor

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Walk interview not accept of all you.only or reffrence

I applied via Job Fair and was interviewed before Nov 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. WTP flow diagram and explain each and every structure functions
  • Ans. 

    A WTP flow diagram shows the process of water treatment and purification.

    • The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.

    • Screens remove large debris and particles from the water.

    • Sedimentation tanks allow suspended particles to settle to the bottom.

    • Filters remove smaller particles and impurities.

    • Disinfection units use chemicals or UV light to kill bact...

  • Answered by AI
  • Q2. What is the reason to change the company
  • Q3. Asked about Design mix details
  • Q4. Why will we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company.. support is depending on site incharge

Megha Engineering & Infrastructures interview questions for designations

 Senior Civil Site Engineer

 (2)

 Civil Engineer

 (13)

 Site Engineer

 (3)

 Senior Civil Engineer

 (10)

 Assistant Engineer - Civil

 (2)

 Junior Engineer Civil

 (1)

 Executive Engineer - Civil

 (1)

 Diploma Civil Engineer

 (1)

Civil Site Engineer Interview Questions & Answers

user image Veeraajay Pamarthi

posted on 9 Oct 2021

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Site engineer topic

Interview Preparation Tips

Interview preparation tips for other job seekers - Site and structures engineer

Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions

Interview Questionnaire 

1 Question

  • Q1. What is site engineer and supervisor
  • Ans. 

    A site engineer is responsible for overseeing construction projects and ensuring they are completed according to plans and specifications. A supervisor is a higher-level position that manages and coordinates the work of site engineers and other construction personnel.

    • Site engineer: responsible for overseeing construction projects, ensuring compliance with plans and specifications

    • Supervisor: higher-level position that m...

  • Answered by AI

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?
Round 2 - Technical 

(1 Question)

  • Q1. Water supply project rwss and EPC industry project

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I'm civil engineer with water supply project and EPC industry project presently working gvpr engineer LTD my experience 8years

Megha Engineering & Infrastructures Interview FAQs

How many rounds are there in Megha Engineering & Infrastructures Civil Site Engineer interview?
Megha Engineering & Infrastructures interview process usually has 1-2 rounds. The most common rounds in the Megha Engineering & Infrastructures interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Megha Engineering & Infrastructures Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Megha Engineering & Infrastructures. The most common topics and skills that interviewers at Megha Engineering & Infrastructures expect are Oil, Refinery, Civil Construction, Gas and HPCL.
What are the top questions asked in Megha Engineering & Infrastructures Civil Site Engineer interview?

Some of the top questions asked at the Megha Engineering & Infrastructures Civil Site Engineer interview -

  1. What is site engineer and supervi...read more
  2. WTP flow diagram and explain each and every structure functi...read more
  3. How to calculate qty of cement sand and aggregate for 1 cu.m concr...read more
How long is the Megha Engineering & Infrastructures Civil Site Engineer interview process?

The duration of Megha Engineering & Infrastructures Civil Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Megha Engineering & Infrastructures Civil Site Engineer Interview Process

based on 14 interviews

2 Interview rounds

  • Technical Round - 1
  • Technical Round - 2
View more
Megha Engineering & Infrastructures Civil Site Engineer Salary
based on 272 salaries
₹2 L/yr - ₹6.6 L/yr
26% more than the average Civil Site Engineer Salary in India
View more details

Megha Engineering & Infrastructures Civil Site Engineer Reviews and Ratings

based on 93 reviews

4.2/5

Rating in categories

4.2

Skill development

4.0

Work-life balance

3.9

Salary

4.2

Job security

4.1

Company culture

3.5

Promotions

4.0

Work satisfaction

Explore 93 Reviews and Ratings
Engineer
901 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Senior Engineer
846 salaries
unlock blur

₹3.2 L/yr - ₹11.5 L/yr

Associate Manager
493 salaries
unlock blur

₹4.8 L/yr - ₹15.5 L/yr

Mechanical Engineer
409 salaries
unlock blur

₹2.1 L/yr - ₹9 L/yr

Civil Engineer
354 salaries
unlock blur

₹2.2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Megha Engineering & Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview