Filter interviews by
I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please provide more context or clarify the question.
I am unable to provide a relevant answer without understanding the question.
Could you please provide more information about what you mean by 'Porject in good pp'?
I'm sorry, but I cannot understand the question. Please provide a clear and understandable question.
Please rephrase the question or provide more context.
I am unable to provide an answer without a clear question.
Can you please clarify the question?
I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.
Top trending discussions
posted on 12 Jun 2024
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
ITP stands for Inspection and Test Plan, a document outlining the procedures and criteria for quality control in a project.
Define the scope and objectives of the project
Identify the key activities and deliverables
Specify the inspection and testing requirements
Outline the acceptance criteria
Assign responsibilities and timelines
Review and approve the ITP before implementation
Checklist can be made by identifying key tasks, setting priorities, creating categories, and including necessary details.
Identify key tasks that need to be completed
Set priorities for each task
Create categories to organize tasks
Include necessary details such as deadlines, responsible parties, and resources needed
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 21 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.
posted on 2 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
Rate analysis is the process of determining the rates of various items of work involved in a construction project.
It involves analyzing the cost of materials, labor, and equipment required for a particular task
It helps in estimating the total cost of a project
It is used to prepare a detailed bill of quantities for a project
It is important for accurate budgeting and cost control
Example: Rate analysis for the constructio...
Documents required for estimation include drawings, specifications, bills of quantities, and site survey reports.
Drawings: architectural, structural, mechanical, electrical, plumbing, etc.
Specifications: detailed descriptions of materials, finishes, and workmanship
Bills of quantities: detailed list of all materials and quantities required for the project
Site survey reports: information about site conditions, soil type,
posted on 17 Jun 2021
BIM application in highway models involves creating a digital representation of the road and its infrastructure.
BIM can be used to design and visualize highway projects
It allows for collaboration between different stakeholders
BIM can help with clash detection and reduce errors in construction
It can also be used for maintenance and asset management
Examples include the use of BIM in the construction of the M25 motorway i
I review/check work of an originator in Civil3D Models by following a systematic approach.
I check for errors and inconsistencies in the model.
I verify that the model adheres to the project standards and specifications.
I ensure that the model is accurate and complete.
I communicate with the originator to clarify any issues or concerns.
I document any changes or revisions made to the model.
I perform a final review before s
Roundabout parameters and values vary based on urban and rural settings.
Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.
Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.
Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.
Roundabout parameters may include lane widths, splitter island wid...
ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.
Road geometry data such as lane widths, radii, and gradients
Traffic flow data such as traffic volume, speed, and composition
Vehicle characteristics such as dimensions, speed, and acceleration
Other inputs such as signal timings and pedestrian crossings
I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.
Expertise in creating and editing surfaces, alignments, profiles, and corridors
Ability to generate 3D models and perform earthwork calculations
Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs
Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow
Proficie...
posted on 21 Mar 2022
I applied via Referral
Interview experience
BIM Modeller
5
salaries
| ₹10.6 L/yr - ₹20 L/yr |
HSE Officer
5
salaries
| ₹1.5 L/yr - ₹1.9 L/yr |
Construction Risk Coordinator
4
salaries
| ₹12 L/yr - ₹28.5 L/yr |
Plumber
4
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Civil Engineer
4
salaries
| ₹9.6 L/yr - ₹24.5 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries