Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Adani Group Interview Questions, Process, and Tips

Updated 17 Feb 2025

Top Adani Group Interview Questions and Answers

View all 78 questions

Adani Group Interview Experiences

Popular Designations

183 interviews found

Junior Engineer Electrical Interview Questions & Answers

user image Poonam Singh Rathore

posted on 12 Feb 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Adani solar energy
  • Q2. Adani solar energy sidda
  • Ans. 

    Adani solar energy sidda

  • Answered by Poonam Singh Rathore
Round 2 - Technical 

(2 Questions)

  • Q1. Adani solar energy
  • Q2. Adani solar energy
Round 3 - Technical 

(2 Questions)

  • Q1. Adani solar energy
  • Q2. Adani solar energy sidda

Junior Engineer Electrical Interview Questions asked at other Companies

Q1. Transformer working principle, what oil use in Transformer, oil not add what happen.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Jan 2025.

Round 1 - Aptitude Test 

Send the mail in aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Your favourite subject
  • Q2. Any type of skills
Round 3 - HR 

(2 Questions)

  • Q1. Are you interested job
  • Q2. Relocate the job
Round 4 - Group Discussion 

Company and work details

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I was interviewed before May 2022.

Round 1 - Technical 

(2 Questions)

  • Q1. Safety related questions
  • Q2. Work permit as per all activities

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm senior EHS officer Rajesh Kumar from visakhapatnam Andhra Pradesh I'm applying for EHS department

Senior Executive - EHS Interview Questions asked at other Companies

Q1. Explain about process flow diagram of Effluent Treatment Plant(ETP), STP, RO, MEE and ATFD?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Maximum Qty pour at a time

Top Adani Group Assistant Manager Interview Questions and Answers

Q1. What IS Codes do you follow for structural steel fabrication and erection works?
View answer (13)

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Adani Group interview questions for popular designations

 Assistant Manager

 (15)

 Deputy Manager

 (9)

 Graduate Engineer Trainee (Get)

 (6)

 Electrical GET

 (4)

 Manager

 (4)

 Senior Manager

 (4)

 Assistant Manager Operations

 (3)

 Associate Manager

 (3)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why do you want to join Google?
  • Q2. Where do you see yourself in 5 years?
Round 2 - Technical 

(2 Questions)

  • Q1. Explain the differences between monolithic and microarchitectures
  • Ans. 

    Monolithic architecture is a single-tiered software application while microarchitecture is a multi-tiered software application.

    • Monolithic architecture is a single-tiered software application where all components are interconnected and interdependent.

    • Microarchitecture is a multi-tiered software application where components are divided into separate layers, each with its own responsibility.

    • Monolithic architecture is easi...

  • Answered by AI
  • Q2. Why is cloud better than on premise?
  • Ans. 

    Cloud offers scalability, cost-effectiveness, flexibility, and accessibility compared to on-premise solutions.

    • Scalability: Cloud allows for easily scaling resources up or down based on demand, while on-premise solutions require physical upgrades.

    • Cost-effectiveness: Cloud eliminates the need for expensive hardware and maintenance costs associated with on-premise solutions.

    • Flexibility: Cloud offers the ability to access ...

  • Answered by AI

Skills evaluated in this interview

Top Adani Group Deputy Manager Interview Questions and Answers

Q1. Brief overview of S&T system used in Railways, Differences between PI & EI, Types of failures in S&T Gears, Reasons for failures, maximum no. of failures attended, RCA analysis
View answer (1)

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

Get interview-ready with Top Adani Group Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many type of equipment used in your company in mines operation.
  • Ans. 

    There are various types of equipment used in mines operations, including heavy machinery, vehicles, drilling equipment, safety gear, and communication devices.

    • Heavy machinery such as excavators, dump trucks, and bulldozers are used for digging and transporting materials.

    • Drilling equipment like drills and blasting tools are used for extracting minerals from the ground.

    • Safety gear such as helmets, gloves, and safety harn...

  • Answered by AI
  • Q2. What is the tyre sixe of CAT772G Dumper.
  • Ans. 

    The tyre size of CAT772G Dumper is 18.00-33.

    • The tyre size of CAT772G Dumper is 18.00-33.

    • The tyre size is important for ensuring proper performance and safety of the vehicle.

    • Having the correct tyre size helps in maintaining stability and traction on various terrains.

  • Answered by AI

Top Adani Group Deputy Manager Interview Questions and Answers

Q1. Brief overview of S&T system used in Railways, Differences between PI & EI, Types of failures in S&T Gears, Reasons for failures, maximum no. of failures attended, RCA analysis
View answer (1)

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

Jobs at Adani Group

View all
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Sep 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Electrical maintenance
  • Q2. Electrical maintenances
  • Q3. Safety Electrical
  • Q4. Prevent maintenance
  • Q5. Power Transformers IDT testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical Maintenance safety

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (11)

fresher interview

user image Wikitechy News

posted on 25 Mar 2022

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Commodity Audit
  • Q2. Warehousing operations
  • Q3. 18 year experience. in warehousing
  • Q4. Local mandi purchasing all type commodity corp survey Farmers-meeting

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge commodities warehousing management quality testing

Purchase Officer Interview Questions asked at other Companies

Q1. HOW YOU WILL HANDLE SITUATIONS WHERE THE USER LACKS KNOWLEDGE AND IS UNABLE TO UNDERSTAND THE EXECUTION OF SOME PURCHASE WORKS?
View answer (5)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old barring slue remove and new barring slue replace a...
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q4. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Q6. Conveyor pully greasing and saving work and safety first and paper work and walked away clean and fresh and grease gunand all pully checking and saving greasing work and paper work cancelled

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

Assistant Manager Maintenance Interview Questions asked at other Companies

Q1. 1. Cost saving initiative in utilities like boiler, air compressor, Cooling Tower etc 2. Types of flow, Reynolds number 3. Selection of heat exchanger as per process, diffrence between shell and tube and Plate type
View answer (1)

Adani Group Interview FAQs

How many rounds are there in Adani Group interview?
Adani Group interview process usually has 2-3 rounds. The most common rounds in the Adani Group interview process are Technical, HR and Resume Shortlist.
How to prepare for Adani Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Adani Group. The most common topics and skills that interviewers at Adani Group expect are Project Management, Compliance, Operations, Software Configuration Management and CCTV Monitoring.
What are the top questions asked in Adani Group interview?

Some of the top questions asked at the Adani Group interview -

  1. What IS Codes do you follow for structural steel fabrication and erection wor...read more
  2. Did you fabricate Built Up Sections? If yes, please explain the requirement of ...read more
  3. How do you ensure the safety of electrical equipment and personnel during maint...read more
How long is the Adani Group interview process?

The duration of Adani Group interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Adani Group Interview Process

based on 253 interviews

Interview experience

4.4
  
Good
View more
Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
ITC Interview Questions
3.9
 • 547 Interviews
Tata Group Interview Questions
4.2
 • 358 Interviews
Bajaj Group Interview Questions
3.8
 • 3 Interviews
View all

Adani Group Reviews and Ratings

based on 1.6k reviews

3.9/5

Rating in categories

3.8

Skill development

3.6

Work-life balance

3.8

Salary

3.9

Job security

3.6

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 1.6k Reviews and Ratings
Cloud Data Platform Admin

Kolkata

3-7 Yrs

₹ 15-25 LPA

Deputy Manager- IR & ER (Adani Solar - Mundra)

Mundra

7-10 Yrs

₹ 11.04-12.5 LPA

Tool Room Incharge

Kanpur

5-7 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
773 salaries
unlock blur

₹5.1 L/yr - ₹18.5 L/yr

Deputy Manager
441 salaries
unlock blur

₹6.4 L/yr - ₹20.3 L/yr

Associate Manager
301 salaries
unlock blur

₹10 L/yr - ₹29 L/yr

Senior Engineer
238 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Manager
228 salaries
unlock blur

₹11 L/yr - ₹34 L/yr

Explore more salaries
Compare Adani Group with

Reliance Industries

4.0
Compare

Tata Group

4.2
Compare

Bharti Enterprises

3.4
Compare

Hindustan Unilever

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview