I applied via Job Fair and was interviewed in Nov 2023. There was 1 interview round.
I applied via Job Portal and was interviewed in May 2022. There were 3 interview rounds.
ASME codes and standards are a set of guidelines and regulations for designing, manufacturing, and testing mechanical equipment.
ASME codes and standards are developed and maintained by the American Society of Mechanical Engineers.
They cover a wide range of industries and applications, including pressure vessels, piping, boilers, and nuclear power plants.
Compliance with ASME codes and standards is often required by law ...
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
Asked demo for matlab
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
WTG operation involves converting wind energy into electrical energy. Synchronous generators produce power at a constant speed, while asynchronous generators vary in speed.
Wind turbine generators (WTGs) convert wind energy into electrical energy through the use of a rotor and a generator.
Synchronous generators produce power at a constant speed that is synchronized with the grid frequency.
Asynchronous generators, also k...
WTG technology refers to Wind Turbine Generator technology used in renewable energy production.
WTG technology involves the use of wind turbines to generate electricity.
The turbines are typically placed in locations with high wind speeds to maximize energy production.
The generated electricity is then fed into the grid for distribution to consumers.
Maintenance of the turbines is crucial to ensure optimal performance and ...
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.
Develop a comprehensive spare parts inventory management system
Regularly assess the condition of spare parts and replace as needed
Implement preventive maintenance strategies to minimize downtime
Establish strong relationships with suppliers to ensure timely availability of spare parts
Monitor and analyze data to identify...
based on 6 interviews
Interview experience
based on 32 reviews
Rating in categories
Assistant Manager
750
salaries
| ₹5.1 L/yr - ₹18.5 L/yr |
Deputy Manager
507
salaries
| ₹6.4 L/yr - ₹20.3 L/yr |
Associate Manager
292
salaries
| ₹11.5 L/yr - ₹27.7 L/yr |
Manager
241
salaries
| ₹11 L/yr - ₹32 L/yr |
Senior Engineer
233
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Suzlon Group
Adani Power
NTPC
Torrent Power