Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Gear box replacement work
Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok
Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok
Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok
Rate your
company
🤫 100% anonymous
How was your last interview experience?
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
I regularly liaise with various departments to ensure smooth operations and communication.
Coordinate with sales team to track inventory levels
Collaborate with HR for recruitment and training programs
Communicate with IT department for software updates
Work closely with finance team for budget planning
TSR stands for Town Survey Record, a document maintained by the government that contains details of land ownership and usage over the past 30 years.
TSR is a record maintained by the government to keep track of land ownership and usage.
It contains information about the history of land transactions, ownership changes, and land use patterns over the past 30 years.
TSR is important for verifying land ownership, resolving di...
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
Asked demo for matlab
I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.
Suzlon Group interview questions for designations
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.
Develop a comprehensive spare parts inventory management system
Regularly assess the condition of spare parts and replace as needed
Implement preventive maintenance strategies to minimize downtime
Establish strong relationships with suppliers to ensure timely availability of spare parts
Monitor and analyze data to identify...
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
WTG operation involves converting wind energy into electrical energy. Synchronous generators produce power at a constant speed, while asynchronous generators vary in speed.
Wind turbine generators (WTGs) convert wind energy into electrical energy through the use of a rotor and a generator.
Synchronous generators produce power at a constant speed that is synchronized with the grid frequency.
Asynchronous generators, also k...
WTG technology refers to Wind Turbine Generator technology used in renewable energy production.
WTG technology involves the use of wind turbines to generate electricity.
The turbines are typically placed in locations with high wind speeds to maximize energy production.
The generated electricity is then fed into the grid for distribution to consumers.
Maintenance of the turbines is crucial to ensure optimal performance and ...
I applied via Walk-in and was interviewed before May 2022. There were 4 interview rounds.
Technical & sense of humor knowledge position related
Our plant process involves several stages including raw material procurement, production, quality control, and packaging.
We start by procuring high-quality raw materials from trusted suppliers.
The raw materials are then processed through various stages of production to create the final product.
Throughout the production process, we have strict quality control measures in place to ensure the product meets our high standa...
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.
HVDC systems are used to transmit electricity over long distances with minimal losses.
They are more efficient than traditional AC systems for long-distance transmission.
HVDC systems use converters to convert AC power to DC power and vice versa.
Examples of HVDC systems include the Itaipu HVDC sy...
A rectifier is an electronic device that converts AC to DC.
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They can be made using diodes or other semiconductor devices.
Rectifiers are essential for many electronic devices to function properly.
Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.
based on 10 interviews
3 Interview rounds
based on 79 reviews
Rating in categories
Electrical Engineer
567
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
538
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
517
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
353
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
279
salaries
| ₹0 L/yr - ₹0 L/yr |
Vestas
Inox Wind
GE Vernova
Siemens Gamesa Renewable Power Private Limited