i
Adani Group
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I have 5 years of experience in managing electrical maintenance operations within a thermal power plant.
Managed a team of 10 technicians and ensured timely completion of maintenance tasks
Developed and implemented preventive maintenance schedules to minimize downtime
Troubleshot and resolved electrical issues in a timely and efficient manner
Maintained inventory of spare parts and equipment to ensure availability when nee
Safety of electrical equipment and personnel is ensured through proper training, equipment maintenance, and following safety protocols.
Regular training sessions for personnel on safety protocols and procedures
Strict adherence to safety guidelines and regulations
Regular maintenance and inspection of electrical equipment
Use of personal protective equipment (PPE) such as gloves, helmets, and safety glasses
Proper grounding...
To optimize electrical maintenance schedule, I would implement the following strategies:
Conduct regular inspections to identify potential issues before they become major problems
Implement a preventive maintenance program to ensure all equipment is properly maintained
Utilize predictive maintenance techniques such as vibration analysis and thermography to detect potential failures before they occur
Schedule maintenance du...
I stay updated through industry publications, attending conferences, and networking with peers. I have applied this knowledge in previous roles by implementing new technologies and improving maintenance processes.
I regularly read industry publications such as Power Engineering International and attend conferences like the International Conference on Power and Energy Systems.
I also network with peers in the industry to ...
I was involved in a project to upgrade the electrical system of a manufacturing plant.
The project involved replacing outdated equipment and rewiring the entire facility.
We faced challenges with limited downtime for the plant and coordinating with multiple contractors.
To overcome these obstacles, we created a detailed project plan and timeline, and communicated regularly with all stakeholders.
We also worked closely with...
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
Monolithic architecture is a single-tiered software application while microarchitecture is a multi-tiered software application.
Monolithic architecture is a single-tiered software application where all components are interconnected and interdependent.
Microarchitecture is a multi-tiered software application where components are divided into separate layers, each with its own responsibility.
Monolithic architecture is easi...
Cloud offers scalability, cost-effectiveness, flexibility, and accessibility compared to on-premise solutions.
Scalability: Cloud allows for easily scaling resources up or down based on demand, while on-premise solutions require physical upgrades.
Cost-effectiveness: Cloud eliminates the need for expensive hardware and maintenance costs associated with on-premise solutions.
Flexibility: Cloud offers the ability to access ...
There are various types of equipment used in mines operations, including heavy machinery, vehicles, drilling equipment, safety gear, and communication devices.
Heavy machinery such as excavators, dump trucks, and bulldozers are used for digging and transporting materials.
Drilling equipment like drills and blasting tools are used for extracting minerals from the ground.
Safety gear such as helmets, gloves, and safety harn...
The tyre size of CAT772G Dumper is 18.00-33.
The tyre size of CAT772G Dumper is 18.00-33.
The tyre size is important for ensuring proper performance and safety of the vehicle.
Having the correct tyre size helps in maintaining stability and traction on various terrains.
Adani Group interview questions for popular designations
I was interviewed in Sep 2024.
Get interview-ready with Top Adani Group Interview Questions
Yes, I am confident in my ability to survive and thrive in a remote site.
I am resourceful and can adapt to new environments quickly
I have experience in camping and outdoor survival skills
I am comfortable with limited access to technology and amenities
I am self-sufficient and can problem-solve independently
Yes, I am comfortable managing everything online for Adani.
I have experience working with online tools and platforms for project management.
I am proficient in using communication tools like email, video conferencing, and project management software.
I am adaptable and quick to learn new technologies and processes.
I can effectively coordinate with team members and stakeholders remotely.
I prioritize clear and timely commu
Yes, I am confident in my ability to manage without assistance.
I am a self-starter and can work independently
I have experience in managing projects without assistance
I am resourceful and can find solutions on my own
Yes, I am committed to delivering 100% efficiency in my role as Associate Manager - PRMC.
I have a track record of meeting and exceeding expectations in my previous roles.
I am dedicated to continuous improvement and finding ways to streamline processes.
I am proactive in identifying and addressing any potential obstacles to efficiency.
I prioritize time management and organization to ensure maximum productivity.
I am open ...
I was interviewed in Jul 2024.
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Referral and was interviewed in Aug 2024. There were 2 interview rounds.
Shaft runout can occur due to misalignment, imbalance, or manufacturing defects, and can be corrected by balancing, alignment, or replacing the shaft.
Shaft runout can be caused by misalignment of components, such as couplings or bearings.
Imbalance in rotating parts can also lead to shaft runout.
Manufacturing defects in the shaft itself can result in runout.
Correction methods include balancing the rotating parts, aligni...
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
Top trending discussions
Interview experience
based on 1.4k reviews
Rating in categories
Ahmedabad
14-17 Yrs
Not Disclosed
Assistant Manager
747
salaries
| ₹5.1 L/yr - ₹18.5 L/yr |
Deputy Manager
490
salaries
| ₹6.4 L/yr - ₹20.3 L/yr |
Associate Manager
314
salaries
| ₹10 L/yr - ₹29 L/yr |
Manager
239
salaries
| ₹11 L/yr - ₹32.3 L/yr |
Senior Manager
208
salaries
| ₹14 L/yr - ₹47 L/yr |
Reliance Industries
Tata Group
Bharti Enterprises
Hindustan Unilever