Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Adani Group Assistant Manager Maintenance Interview Questions and Answers

Updated 19 Jul 2024

Adani Group Assistant Manager Maintenance Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old barring slue remove and new barring slue replace a...
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q4. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Q6. Conveyor pully greasing and saving work and safety first and paper work and walked away clean and fresh and grease gunand all pully checking and saving greasing work and paper work cancelled

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What about your daily tasks
  • Ans. 

    As an Assistant Manager in Maintenance, my daily tasks include overseeing maintenance operations, scheduling repairs, managing budgets, and supervising maintenance staff.

    • Overseeing maintenance operations to ensure equipment and facilities are in good working condition

    • Scheduling repairs and maintenance tasks to minimize downtime and maximize efficiency

    • Managing budgets for maintenance projects and ensuring cost-effective...

  • Answered by AI
  • Q2. Why you want to join the company
  • Ans. 

    I am impressed by the company's reputation for excellence in maintenance management and want to contribute my skills to further enhance its operations.

    • Company's strong reputation for excellence in maintenance management

    • Opportunity to contribute my skills and expertise

    • Desire to be part of a successful and innovative team

  • Answered by AI
  • Q3. What are your goals
  • Ans. 

    My professional goal is to become a skilled and effective Assistant Manager Maintenance, leading a team to ensure optimal functioning of equipment and facilities.

    • Advance my technical skills in maintenance and repair

    • Develop strong leadership and communication abilities

    • Implement efficient maintenance strategies to minimize downtime

    • Work towards achieving certifications or further education in maintenance management

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Practise technical questions
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Based on hydraulics line direction & valve
  • Q2. Generally based on resume & profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be fear become fully confident in interview

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

Interview Questionnaire 

2 Questions

  • Q1. Have you worked with Foreign Clients
  • Q2. How good is your design and skills in Solar Industry
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Favourite product
  • Q2. Things one like about the product
  • Q3. Top problems with the product and solution
  • Ans. 

    Top problems with the product include slow loading times, frequent crashes, and lack of user-friendly interface.

    • Slow loading times can frustrate users and lead to decreased usage of the product.

    • Frequent crashes can result in loss of data and negative user experience.

    • Lack of user-friendly interface can make it difficult for users to navigate the product and find desired features.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Introduction and previous work ex
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Why do you think you are fit for the role?

Adani Group Interview FAQs

How many rounds are there in Adani Group Assistant Manager Maintenance interview?
Adani Group interview process usually has 2 rounds. The most common rounds in the Adani Group interview process are Group Discussion and HR.
How to prepare for Adani Group Assistant Manager Maintenance interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Adani Group. The most common topics and skills that interviewers at Adani Group expect are Automation Testing, Clinical SAS Programming, Drives, HMI and Industrial Automation.
What are the top questions asked in Adani Group Assistant Manager Maintenance interview?

Some of the top questions asked at the Adani Group Assistant Manager Maintenance interview -

  1. Barring checking and replacement work and safety first and paper work and walke...read more
  2. V-scraper replacement work and safety first and paper work and walked away clea...read more
  3. Motor replacement work and safety first and paper work and walked away clean an...read more

Tell us how to improve this page.

Adani Group Assistant Manager Maintenance Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 226 Interviews
Tata Power Interview Questions
3.9
 • 164 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Torrent Power Interview Questions
3.7
 • 131 Interviews
Suzlon Group Interview Questions
4.1
 • 130 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Hitachi Energy Interview Questions
4.1
 • 85 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
Enphase Energy Interview Questions
2.9
 • 42 Interviews
View all
Adani Group Assistant Manager Maintenance Salary
based on 6 salaries
₹6.5 L/yr - ₹12 L/yr
At par with the average Assistant Manager Maintenance Salary in India
View more details
Assistant Manager
745 salaries
unlock blur

₹5.1 L/yr - ₹18.5 L/yr

Deputy Manager
509 salaries
unlock blur

₹6.4 L/yr - ₹20.3 L/yr

Associate Manager
288 salaries
unlock blur

₹10 L/yr - ₹29 L/yr

Manager
241 salaries
unlock blur

₹11 L/yr - ₹32 L/yr

Senior Engineer
231 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Adani Group with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview