Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Adani Group Assistant Manager Maintenance Interview Questions and Answers

Updated 19 Jul 2024

Adani Group Assistant Manager Maintenance Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old barring slue remove and new barring slue replace a...
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q4. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Q6. Conveyor pully greasing and saving work and safety first and paper work and walked away clean and fresh and grease gunand all pully checking and saving greasing work and paper work cancelled

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What about your daily tasks
  • Ans. 

    As an Assistant Manager in Maintenance, my daily tasks include overseeing maintenance operations, scheduling repairs, managing budgets, and supervising maintenance staff.

    • Overseeing maintenance operations to ensure equipment and facilities are in good working condition

    • Scheduling repairs and maintenance tasks to minimize downtime and maximize efficiency

    • Managing budgets for maintenance projects and ensuring cost-effective...

  • Answered by AI
  • Q2. Why you want to join the company
  • Ans. 

    I am impressed by the company's reputation for excellence in maintenance management and want to contribute my skills to further enhance its operations.

    • Company's strong reputation for excellence in maintenance management

    • Opportunity to contribute my skills and expertise

    • Desire to be part of a successful and innovative team

  • Answered by AI
  • Q3. What are your goals
  • Ans. 

    My professional goal is to become a skilled and effective Assistant Manager Maintenance, leading a team to ensure optimal functioning of equipment and facilities.

    • Advance my technical skills in maintenance and repair

    • Develop strong leadership and communication abilities

    • Implement efficient maintenance strategies to minimize downtime

    • Work towards achieving certifications or further education in maintenance management

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Practise technical questions
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Based on hydraulics line direction & valve
  • Q2. Generally based on resume & profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be fear become fully confident in interview
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Why you want to join NTPC
  • Q2. What you should do if some people criticize to yo

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to distribution network, safety and Quality of work related.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never miss guide the inteiviower.

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement

I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Experience related questions Materials selection, material properties Types of hardwares, bolted joints types
Round 3 - Technical 

(1 Question)

  • Q1. Model test on Autodesk Inventor
Round 4 - HR 

(1 Question)

  • Q1. CTC Related discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with you resume/ CV questions more related to resume and experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Past experience based questions
  • Q2. What does your past company General Terms and Conditions about contract say ?
Round 3 - HR 

(2 Questions)

  • Q1. Checked behavioral aspects
  • Q2. Checked about Integrity

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to work with. Offered work from during covid years then hybrid structure.

Adani Group Interview FAQs

How many rounds are there in Adani Group Assistant Manager Maintenance interview?
Adani Group interview process usually has 2 rounds. The most common rounds in the Adani Group interview process are Group Discussion and HR.
How to prepare for Adani Group Assistant Manager Maintenance interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Adani Group. The most common topics and skills that interviewers at Adani Group expect are Automation Testing, Clinical SAS Programming, Drives, HMI and Industrial Automation.
What are the top questions asked in Adani Group Assistant Manager Maintenance interview?

Some of the top questions asked at the Adani Group Assistant Manager Maintenance interview -

  1. Barring checking and replacement work and safety first and paper work and walke...read more
  2. V-scraper replacement work and safety first and paper work and walked away clea...read more
  3. Motor replacement work and safety first and paper work and walked away clean an...read more

Tell us how to improve this page.

Adani Group Assistant Manager Maintenance Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 232 Interviews
Tata Power Interview Questions
3.9
 • 167 Interviews
NTPC Interview Questions
4.2
 • 160 Interviews
Torrent Power Interview Questions
3.7
 • 132 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Hitachi Energy Interview Questions
4.1
 • 89 Interviews
Reliance Power Interview Questions
4.1
 • 48 Interviews
Enphase Energy Interview Questions
2.9
 • 43 Interviews
View all
Adani Group Assistant Manager Maintenance Salary
based on 6 salaries
₹6.5 L/yr - ₹12 L/yr
At par with the average Assistant Manager Maintenance Salary in India
View more details
Assistant Manager
760 salaries
unlock blur

₹6 L/yr - ₹18.5 L/yr

Deputy Manager
507 salaries
unlock blur

₹6.4 L/yr - ₹20.3 L/yr

Associate Manager
291 salaries
unlock blur

₹10 L/yr - ₹27.7 L/yr

Manager
241 salaries
unlock blur

₹11 L/yr - ₹32 L/yr

Senior Engineer
233 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Adani Group with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview