I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.
Role and responsibilities
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
456 code book is used for structural design and construction of buildings.
456 code book is used for designing and constructing buildings according to Indian standards.
It provides guidelines for materials, design criteria, construction practices, and quality control.
The code book covers various aspects such as foundation design, structural design, earthquake resistance, etc.
Engineers and architects refer to the 456 code...
A cement bulker typically has a capacity of around 25-27 metric tons.
Typical capacity is around 25-27 metric tons
Capacity can vary depending on the size and design of the bulker
Capacity may also be influenced by regulations and standards in different regions
RCPT stands for Receiving Process Capability Test and WPT stands for Water Penetration Test.
RCPT is a test used to determine the quality of concrete by measuring its ability to resist chloride ion penetration.
WPT is a test used to assess the water resistance of materials by subjecting them to water under pressure.
Both tests are commonly used in construction and quality control processes.
Adani Group interview questions for popular designations
I have 5 years of experience in managing electrical maintenance operations within a thermal power plant.
Managed a team of 10 technicians and ensured timely completion of maintenance tasks
Developed and implemented preventive maintenance schedules to minimize downtime
Troubleshot and resolved electrical issues in a timely and efficient manner
Maintained inventory of spare parts and equipment to ensure availability when nee
Safety of electrical equipment and personnel is ensured through proper training, equipment maintenance, and following safety protocols.
Regular training sessions for personnel on safety protocols and procedures
Strict adherence to safety guidelines and regulations
Regular maintenance and inspection of electrical equipment
Use of personal protective equipment (PPE) such as gloves, helmets, and safety glasses
Proper grounding...
To optimize electrical maintenance schedule, I would implement the following strategies:
Conduct regular inspections to identify potential issues before they become major problems
Implement a preventive maintenance program to ensure all equipment is properly maintained
Utilize predictive maintenance techniques such as vibration analysis and thermography to detect potential failures before they occur
Schedule maintenance du...
I stay updated through industry publications, attending conferences, and networking with peers. I have applied this knowledge in previous roles by implementing new technologies and improving maintenance processes.
I regularly read industry publications such as Power Engineering International and attend conferences like the International Conference on Power and Energy Systems.
I also network with peers in the industry to ...
I was involved in a project to upgrade the electrical system of a manufacturing plant.
The project involved replacing outdated equipment and rewiring the entire facility.
We faced challenges with limited downtime for the plant and coordinating with multiple contractors.
To overcome these obstacles, we created a detailed project plan and timeline, and communicated regularly with all stakeholders.
We also worked closely with...
Get interview-ready with Top Adani Group Interview Questions
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Write as much as you can on the topic of India's fake on Russia Ukraine war
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
Material handling process using belt conveyor system involves transporting materials efficiently. The width and type of belt conveyor depend on the specific application.
Belt conveyor system is used to transport materials from one location to another in a production facility or warehouse.
The width of the belt conveyor depends on the size and weight of the materials being transported. It can range from a few inches to se...
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2023. There were 4 interview rounds.
Seal plans are categorized into various types based on their design and application in industrial settings.
Type 01: Single seal plan with no external flush
Type 02: Single seal plan with external flush
Type 11: Dual seal plan with no external flush
Type 12: Dual seal plan with external flush
Type 21: Tandem seal plan with no external flush
Type 22: Tandem seal plan with external flush
I have handled various types of packages including software packages, hardware packages, and service packages.
Software packages such as Microsoft Office, Adobe Creative Suite
Hardware packages like computer systems, printers, and networking equipment
Service packages such as maintenance contracts, support services
A contract for boiler maintenance is typically formed through negotiation, agreement on terms and conditions, and signing of a formal document.
Negotiation of terms and conditions between the buyer and the maintenance provider
Agreement on scope of work, pricing, duration, and other relevant details
Drafting of a formal contract outlining the agreed upon terms
Signing of the contract by both parties to make it legally bind
I am a highly motivated and experienced Techno Commercial Buyer with a strong background in procurement and negotiation.
Over 5 years of experience in sourcing and purchasing materials for various industries
Skilled in analyzing market trends and negotiating contracts with suppliers
Proven track record of cost savings and improving supply chain efficiency
Proficient in using ERP systems and other procurement tools
Excellent
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
Top trending discussions
Interview experience
based on 1.4k reviews
Rating in categories
Ahmedabad
14-17 Yrs
Not Disclosed
Assistant Manager
747
salaries
| â‚ą5.1 L/yr - â‚ą18.5 L/yr |
Deputy Manager
490
salaries
| â‚ą6.4 L/yr - â‚ą20.3 L/yr |
Associate Manager
314
salaries
| â‚ą10 L/yr - â‚ą29 L/yr |
Manager
239
salaries
| â‚ą11 L/yr - â‚ą32.3 L/yr |
Senior Manager
208
salaries
| â‚ą14 L/yr - â‚ą47 L/yr |
Reliance Industries
Tata Group
Bharti Enterprises
Hindustan Unilever