I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
456 code book is used for structural design and construction of buildings.
456 code book is used for designing and constructing buildings according to Indian standards.
It provides guidelines for materials, design criteria, construction practices, and quality control.
The code book covers various aspects such as foundation design, structural design, earthquake resistance, etc.
Engineers and architects refer to the 456 code...
A cement bulker typically has a capacity of around 25-27 metric tons.
Typical capacity is around 25-27 metric tons
Capacity can vary depending on the size and design of the bulker
Capacity may also be influenced by regulations and standards in different regions
RCPT stands for Receiving Process Capability Test and WPT stands for Water Penetration Test.
RCPT is a test used to determine the quality of concrete by measuring its ability to resist chloride ion penetration.
WPT is a test used to assess the water resistance of materials by subjecting them to water under pressure.
Both tests are commonly used in construction and quality control processes.
Top trending discussions
I applied via Approached by Company and was interviewed before Nov 2022. There were 4 interview rounds.
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.
Perform dynamic balancing of the fan blades to minimize vibrations.
Ensure proper alignment of the fan with the motor and the surrounding structure.
Regularly inspect and maintain the fan components to prevent wear and tear.
Use vibration analysis techniques to identify and address any potential issues.
Consider installing vibrat...
We follow a permit system based on the project requirements and local regulations.
Our permit system ensures compliance with safety standards and legal requirements.
We obtain permits for activities such as construction, electrical work, and hazardous material handling.
The specific permit requirements vary depending on the nature of the project and the location.
We work closely with regulatory authorities to ensure timely...
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via LinkedIn and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Load factor is the ratio of the actual output of a power plant to its maximum possible output over a period of time.
Load factor is calculated by dividing the average power output by the maximum power output over a specific period.
A high load factor indicates efficient utilization of the plant's capacity, while a low load factor suggests underutilization.
It is important for assessing the economic performance of a power ...
A steam turbine in a thermal power plant converts thermal energy into mechanical energy through a series of components and processes.
Main components of a steam turbine include rotor, blades, casing, and steam inlet/outlet.
Functions of a steam turbine include converting thermal energy into mechanical energy, generating electricity, and driving the generator.
Working principle involves high-pressure steam entering the tur...
Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.
Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.
Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.
Efficient heat transfer can be achieved ...
Primary responsibilities include ensuring smooth operation of electrical systems in a thermal power plant. Testing and commissioning a generator involves several steps.
Ensure proper maintenance and operation of electrical equipment to prevent breakdowns
Troubleshoot electrical issues and perform repairs as needed
Monitor electrical systems for efficiency and safety
Conduct regular inspections and tests to identify potenti...
Main factors affecting thermal power plant efficiency and strategies for optimization.
Main factors include boiler efficiency, turbine efficiency, heat rate, and plant load factor.
Optimization strategies include regular maintenance, use of advanced technology, and efficient fuel management.
Example project: Implementing a heat recovery system to capture waste heat and improve overall efficiency.
Example initiative: Upgrad...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
756
salaries
| ₹6 L/yr - ₹18.5 L/yr |
Deputy Manager
509
salaries
| ₹6.4 L/yr - ₹20.3 L/yr |
Associate Manager
312
salaries
| ₹10 L/yr - ₹29 L/yr |
Manager
241
salaries
| ₹11 L/yr - ₹32 L/yr |
Senior Engineer
230
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Suzlon Group
Adani Power
NTPC
Torrent Power