Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Civil Engineer Interview Questions, Process, and Tips

Updated 10 Nov 2024

Top KEC International Civil Engineer Interview Questions and Answers

KEC International Civil Engineer Interview Experiences

6 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me about your current project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go through is codes

Civil Engineer Interview Questions Asked at Other Companies

Q1. What is the curing formalities for our precast segment???
Q2. What is the lap length of steel in tension zone & compression ... read more
asked in BHEL
Q3. 1)What is the difference of contraction joint & expansion joi ... read more
asked in Lodha Group
Q4. Describe in general, the various stages in construction of reside ... read more
Q5. What is workability of concrete ?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Cost of pile per Running metre
  • Ans. 

    Cost of pile per running meter is determined by factors like material, length, diameter, soil conditions, and installation method.

    • Cost of pile per running meter can vary based on the material used (concrete, steel, timber, etc.)

    • The length and diameter of the pile will also impact the cost per running meter

    • Soil conditions at the site can affect the cost as well

    • The method of installation (driven, drilled, etc.) will also...

  • Answered by AI
  • Q2. Process of Piling work
  • Ans. 

    Piling work involves driving piles into the ground to provide support for structures.

    • Piling work starts with site investigation to determine soil conditions

    • Piles are driven into the ground using various methods such as impact hammers or vibratory hammers

    • Different types of piles include driven piles, bored piles, and screw piles

    • Piling work requires careful planning and coordination with other construction activities

  • Answered by AI
  • Q3. Why Target compressing strength is always greater than Characteristics compressive strength ?
  • Ans. 

    Target compressive strength is greater due to safety factors and variations in material properties.

    • Target compressive strength accounts for safety factors to ensure structural integrity.

    • Characteristics compressive strength is based on ideal conditions and may not account for all variables.

    • Variations in material properties can lead to differences between target and characteristics compressive strength.

    • Target compressive...

  • Answered by AI
  • Q4. What is full form of "NCR" ?
  • Ans. 

    National Capital Region

    • Full form: National Capital Region

    • Refers to the metropolitan area in India that encompasses the entire NCT of Delhi and several districts in neighboring states

    • Includes cities like Gurgaon, Noida, Ghaziabad, Faridabad, etc.

  • Answered by AI
  • Q5. What is QAP and Method statement and why is this important?
  • Ans. 

    QAP stands for Quality Assurance Plan and Method Statement is a document detailing how a particular task will be completed.

    • QAP outlines the quality control procedures and standards that will be followed during a project.

    • Method statement provides a step-by-step guide on how a specific task will be carried out, ensuring safety and efficiency.

    • Both documents are important in ensuring that projects are completed to a high s...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For 300 mm dia. it's around ₹2200 per RM

I applied via Company Website

Interview Questionnaire 

4 Questions

  • Q1. Tell Me about yourself?
  • Ans. 

    I am a civil engineer with a passion for designing and constructing infrastructure projects.

    • I have a Bachelor's degree in Civil Engineering from XYZ University.

    • I have worked on various construction projects, including bridges, highways, and buildings.

    • I am skilled in using software like AutoCAD and Revit for designing structures.

    • I have experience in project management and ensuring projects are completed on time and with...

  • Answered by AI
  • Q2. What are you looking after or what are your responsibilities/duties?
  • Ans. 

    As a Civil Engineer, my responsibilities include designing, planning, and overseeing construction projects.

    • Designing and analyzing structures such as buildings, bridges, and roads

    • Preparing cost estimates and project schedules

    • Ensuring compliance with building codes and regulations

    • Supervising construction activities and managing contractors

    • Conducting site visits and inspections

    • Collaborating with architects, surveyors, an...

  • Answered by AI
  • Q3. What is you Project type?.......What is the area of your floor?......What is the steel/Shuttering/concrete quantity per floor?...... what is the de-shuttering periods. (For each members i.e. Beam, column &...
  • Ans. 

    Answering questions related to project type, floor area, steel/shuttering/concrete quantity and de-shuttering periods.

    • Project type is commercial building with 10 floors

    • Floor area is 1000 sq. meters per floor

    • Steel quantity per floor is 50 tons, shuttering quantity is 1000 sq. meters and concrete quantity is 500 cubic meters

    • De-shuttering period for beams is 14 days, for columns is 21 days and for slab is 7 days

  • Answered by AI
  • Q4. Follow me on insta i can give more points which will help you to get a job.

Interview Preparation Tips

Interview preparation tips for other job seekers - All all the details about your project you will crack the interview easily.

KEC International interview questions for designations

 Senior Civil Engineer

 (4)

 Civil Site Engineer

 (2)

 Junior Engineer Civil

 (2)

 Assistant Engineer - Civil

 (1)

 Civil Execution Engineer

 (1)

 Manager Civil

 (2)

 Civil Supervisor

 (2)

 Civil Foreman

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Discussion about the current profile.
Round 3 - Technical 

(1 Question)

  • Q1. Technical roundy regarding your current profile and the profile you are being appointed for.
Round 4 - HR 

(1 Question)

  • Q1. Discussion about salary and negotiations.

Interview Questionnaire 

3 Questions

  • Q1. Salary discussion and finalization
  • Q2. Questions regarding previous experience
  • Q3. Technical codes, Execution

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Civil engineering sewage project
  • Q2. Civil engineering
Round 2 - Technical 

(2 Questions)

  • Q1. Excavation engineering sewage project
  • Q2. Civil engineering 6 year sewage project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Current job responsibilities?
Round 3 - Final decision for acceptance 

(1 Question)

  • Q1. Is the job is suitable for you or not?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and passionate
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for leaving current company
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new area

  • Answered by AI
  • Q2. Current job location
  • Ans. 

    Currently working in a construction company in downtown Los Angeles.

    • Working in downtown Los Angeles

    • Construction company

    • Civil engineering job

  • Answered by AI

KEC International Interview FAQs

How many rounds are there in KEC International Civil Engineer interview?
KEC International interview process usually has 1-2 rounds. The most common rounds in the KEC International interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in KEC International Civil Engineer interview?

Some of the top questions asked at the KEC International Civil Engineer interview -

  1. What is QAP and Method statement and why is this importa...read more
  2. Why Target compressing strength is always greater than Characteristics compress...read more
  3. What is full form of "NCR...read more

Tell us how to improve this page.

KEC International Civil Engineer Interview Process

based on 15 interviews

2 Interview rounds

  • Technical Round
  • HR Round
View more
KEC International Civil Engineer Salary
based on 222 salaries
₹1 L/yr - ₹8.9 L/yr
26% more than the average Civil Engineer Salary in India
View more details

KEC International Civil Engineer Reviews and Ratings

based on 64 reviews

4.6/5

Rating in categories

4.2

Skill development

4.4

Work-life balance

4.4

Salary

4.3

Job security

4.3

Company culture

3.5

Promotions

4.2

Work satisfaction

Explore 64 Reviews and Ratings
Assistant Manager
656 salaries
unlock blur

₹5.2 L/yr - ₹18.7 L/yr

Senior Engineer
437 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
222 salaries
unlock blur

₹1 L/yr - ₹8.9 L/yr

Project Engineer
212 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Project Manager
199 salaries
unlock blur

₹10.2 L/yr - ₹43 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview