i
AtkinsRealis
Filter interviews by
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
posted on 18 Jul 2024
posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 14 Feb 2023
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 24 May 2024
I applied via Approached by Company and was interviewed in Apr 2024. There were 3 interview rounds.
General knowledge test
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.
FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.
Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.
SIL (Safety Integrity Level) is a...
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
I have 5 years of experience as a Project Engineer Civil. My skills include project management, structural design, and construction supervision.
5 years of experience as a Project Engineer Civil
Proficient in project management, structural design, and construction supervision
Managed multiple civil engineering projects from conception to completion
Developed and implemented project plans, budgets, and schedules
Collaborated...
I have worked on various civil engineering projects, specializing in project management and design.
Managed a team of engineers and contractors to successfully complete a bridge construction project within the given timeline and budget.
Designed and supervised the construction of a wastewater treatment plant, ensuring compliance with environmental regulations.
Implemented innovative solutions to optimize the design and co...
based on 2 interviews
Interview experience
Bangalore / Bengaluru
5-10 Yrs
Not Disclosed
Assistant Engineer
244
salaries
| ₹4.6 L/yr - ₹11 L/yr |
Graduate Engineer
196
salaries
| ₹3 L/yr - ₹7.5 L/yr |
HR Analyst
103
salaries
| ₹3.6 L/yr - ₹7.4 L/yr |
Design Engineer
98
salaries
| ₹6.3 L/yr - ₹24 L/yr |
Assistant Lead Designer
97
salaries
| ₹6 L/yr - ₹13.5 L/yr |
Jacobs Engineering Group
Bechtel
Fluor Corporation
AECOM