Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by AECOM Team. If you also belong to the team, you can get access from here

AECOM

Compare button icon Compare button icon Compare
4.3

based on 1.6k Reviews

Filter interviews by

AECOM Assistant Project Manager Interview Questions and Answers

Updated 19 Jan 2022

AECOM Assistant Project Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All civil work related questions asked me.
  • Q2. All civil work, quality, safety specification , technical method.
  • Q3. Planning ( msp), work scheduling.project target capture planned.

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Past Experience
  • Q2. Earned value management
  • Q3. MS Project basics, floats, baseline, CPM, PERT
  • Q4. Concrete Technology, BBS questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basic to details asked mostly from past experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Civil engineer 

(2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak

I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to project management & engineering services.
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?
  • Ans. 

    FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.

    • FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.

    • Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.

    • SIL (Safety Integrity Level) is a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about your Past experience
  • Ans. 

    I have over 10 years of experience in project management, leading cross-functional teams and delivering successful projects.

    • Managed a team of 15 project managers and successfully delivered multiple projects within budget and timeline

    • Implemented project management methodologies and tools to improve efficiency and productivity

    • Led the implementation of a new CRM system, resulting in improved customer satisfaction and incr...

  • Answered by AI
  • Q2. Tell me about yourself
  • Ans. 

    Experienced project manager with a proven track record in leading successful projects and teams.

    • Over 10 years of experience in project management

    • Managed cross-functional teams and delivered projects on time and within budget

    • Implemented project management methodologies and best practices

    • Strong leadership and communication skills

    • Successfully completed a major software implementation project for a Fortune 500 company

  • Answered by AI
  • Q3. How you are facing a difficult period like carona
  • Ans. 

    During the difficult period of COVID-19, I adapted by implementing remote work strategies, ensuring team communication and collaboration, and adjusting project timelines and priorities.

    • Implemented remote work strategies to ensure the safety and well-being of the team

    • Utilized collaboration tools and platforms to maintain effective communication

    • Adjusted project timelines and priorities to accommodate the changing circums...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The company is one of the reputed companies in India.Salary delivering in prompt.Job satisfaction depends upon Site Management who is handling the site .Everything in systematic

I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experience based question ask in interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared the interview as per basic questions and experience based.

AECOM Interview FAQs

How to prepare for AECOM Assistant Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at AECOM. The most common topics and skills that interviewers at AECOM expect are Project Management, Construction, Analytical skills, Billing and Civil Engineering.
What are the top questions asked in AECOM Assistant Project Manager interview?

Some of the top questions asked at the AECOM Assistant Project Manager interview -

  1. Planning ( msp), work scheduling.project target capture plann...read more
  2. All civil work, quality, safety specification , technical meth...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
View all

Fast track your campus placements

View all
AECOM Assistant Project Manager Salary
based on 44 salaries
₹6 L/yr - ₹16 L/yr
16% more than the average Assistant Project Manager Salary in India
View more details

AECOM Assistant Project Manager Reviews and Ratings

based on 6 reviews

4.4/5

Rating in categories

4.4

Skill development

4.4

Work-life balance

4.1

Salary

3.8

Job security

4.4

Company culture

3.8

Promotions

4.1

Work satisfaction

Explore 6 Reviews and Ratings
Project Engineer
254 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Senior Engineer
209 salaries
unlock blur

₹7.5 L/yr - ₹24.7 L/yr

L2 Engineer
147 salaries
unlock blur

₹3.4 L/yr - ₹10 L/yr

Architect
132 salaries
unlock blur

₹4.1 L/yr - ₹14.9 L/yr

Engineer
127 salaries
unlock blur

₹3.2 L/yr - ₹14.5 L/yr

Explore more salaries
Compare AECOM with

Jacobs Engineering Group

4.1
Compare

Fluor Corporation

4.3
Compare

Bechtel

4.0
Compare

Worley

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview