Upload Button Icon Add office photos

Worley

Compare button icon Compare button icon Compare

Filter interviews by

Worley Deputy Project Manager Interview Questions and Answers

Updated 27 Nov 2022

Worley Deputy Project Manager Interview Experiences

1 interview found

I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to project management & engineering services.
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?
  • Ans. 

    FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.

    • FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.

    • Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.

    • SIL (Safety Integrity Level) is a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

Interview questions from similar companies

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

Worley Interview FAQs

How many rounds are there in Worley Deputy Project Manager interview?
Worley interview process usually has 2 rounds. The most common rounds in the Worley interview process are Resume Shortlist and Technical.
What are the top questions asked in Worley Deputy Project Manager interview?

Some of the top questions asked at the Worley Deputy Project Manager interview -

  1. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazi...read more
  2. I had been interviewed for Project engineer role. The interview was conducted b...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 449 Interviews
KEC International Interview Questions
4.0
 • 309 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
View all
Worley Deputy Project Manager Salary
based on 10 salaries
₹19.5 L/yr - ₹30 L/yr
128% more than the average Deputy Project Manager Salary in India
View more details

Worley Deputy Project Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Process Engineer
345 salaries
unlock blur

₹4 L/yr - ₹16 L/yr

Deputy Manager
205 salaries
unlock blur

₹9.5 L/yr - ₹32 L/yr

Piping Designer
165 salaries
unlock blur

₹4.7 L/yr - ₹15.1 L/yr

Piping Design Engineer
156 salaries
unlock blur

₹6.3 L/yr - ₹23.4 L/yr

Piping Engineer
153 salaries
unlock blur

₹4.5 L/yr - ₹18 L/yr

Explore more salaries
Compare Worley with

Larsen & Toubro Limited

3.9
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview