Deputy Manager Civil
10+ Deputy Manager Civil Interview Questions and Answers

Asked in UltraTech Cement

Q. How do you create documentation like JMR, BBS, and extra work measurements?
Creating documentation like JMR, BBS, Extra work measurements requires thorough understanding of project requirements and standards.
Identify project requirements and standards
Gather necessary data and information
Create a template for the documentation
Fill in the required details and information
Review and verify the accuracy of the documentation
Submit the documentation for approval

Asked in UltraTech Cement

Q. What procedures do you follow for final bill processing?
The procedures for final bill processing involve verifying the work completion, checking for any discrepancies, and obtaining necessary approvals.
Verify that all work has been completed as per the contract
Check for any discrepancies in the work done and the bill submitted
Obtain necessary approvals from the concerned authorities
Prepare the final bill and submit it for payment

Asked in UltraTech Cement

Q. How do you ensure project completion with safety and quality?
To complete a project with safety and quality, it is important to prioritize safety measures and implement quality control processes.
Develop a comprehensive safety plan and ensure all workers are trained on safety procedures.
Implement quality control measures such as regular inspections and testing.
Use high-quality materials and equipment to ensure the project meets quality standards.
Communicate regularly with the project team to address any safety or quality concerns.
Ensure ...read more

Asked in UltraTech Cement

Q. If someone is not following safety procedures, how would you address it?
Effective communication is key to ensuring safety compliance among team members in civil engineering.
Address the individual privately to avoid embarrassment and maintain respect.
Use specific examples of safety violations to illustrate the issue, such as not wearing a hard hat on site.
Explain the potential consequences of unsafe practices, like injury or project delays.
Encourage open dialogue by asking for their perspective on safety protocols.
Reinforce the importance of safet...read more

Asked in Indus Projects

Q. As a site engineer, how would you handle an entire construction site?
As a site engineer, handling the whole construction site requires effective planning, communication, and coordination.
Develop a detailed project plan and schedule to ensure timely completion of tasks
Regularly communicate with the project manager, subcontractors, and other stakeholders to ensure everyone is on the same page
Ensure compliance with safety regulations and quality standards
Monitor progress and make adjustments as necessary
Maintain accurate records and documentation...read more

Asked in UltraTech Cement

Q. How can rework be avoided during execution?
Rework can be avoided by proper planning and communication.
Ensure clear communication with all stakeholders
Create a detailed project plan and schedule
Conduct regular quality checks during execution
Use experienced and skilled workers
Use high-quality materials
Ensure proper training and supervision of workers
Implement a feedback system to address issues promptly
Deputy Manager Civil Jobs



Asked in Tata Projects

Q. What is the role of an execution engineer?
An execution engineer oversees construction projects, ensuring they are completed on time, within budget, and to quality standards.
Project Planning: Develops detailed execution plans, including timelines and resource allocation. Example: Creating a Gantt chart for a bridge project.
Quality Control: Ensures that construction meets specified standards and regulations. Example: Conducting regular site inspections.
Team Coordination: Manages and coordinates the work of various team...read more

Asked in The Ramco Cements

Q. IS CODES for concrete
IS CODES are Indian standards for concrete construction.
IS CODES stand for Indian Standards Codes for concrete construction.
They provide guidelines and specifications for quality control, testing, and design of concrete structures.
Examples include IS 456:2000 for plain and reinforced concrete, IS 3370:1965 for concrete structures for storage of liquids, and IS 10262:2019 for concrete mix design.
Adherence to IS CODES ensures safety, durability, and quality in construction proj...read more
Share interview questions and help millions of jobseekers 🌟

Asked in The Ramco Cements

Q. How can costs be reduced?
Cost reduction can be achieved through various measures such as optimizing resources, streamlining processes, and negotiating with suppliers.
Optimizing resources such as labor, materials, and equipment
Streamlining processes to eliminate waste and increase efficiency
Negotiating with suppliers for better pricing and terms
Implementing cost-saving measures such as energy-efficient systems
Outsourcing non-core functions to reduce overhead costs

Asked in UltraTech Cement

Q. How do you sustain manpower?
Sustaining manpower requires a positive work environment, fair compensation, and opportunities for growth.
Create a positive work environment through open communication and recognition of achievements
Offer fair compensation and benefits to attract and retain employees
Provide opportunities for growth and development through training and career advancement
Encourage work-life balance to prevent burnout and turnover
Regularly assess and address employee satisfaction and concerns

Asked in The Ramco Cements

Q. Tell me about your work experience in cement plants.
I have 5 years of work experience in a cement plant, where I managed various civil engineering projects.
Managed construction projects such as building new structures, repairing existing ones, and overseeing maintenance work
Ensured compliance with safety regulations and quality standards
Collaborated with engineers, contractors, and other stakeholders to ensure project success
Implemented cost-effective solutions to optimize project outcomes
Utilized project management software t...read more

Asked in G R Infraprojects

Q. IS code for bearing
The IS code for bearing is IS 11592:1985.
IS 11592:1985 is the Indian Standard code for selection and design of belt conveyors.
It provides guidelines for the selection and design of belt conveyors used in mines and other industries.
The code covers various aspects such as belt width, speed, power requirements, material characteristics, etc.
It ensures the safe and efficient operation of belt conveyors.
Compliance with the IS code is important for ensuring quality and reliability ...read more

Asked in CBRE

Q. What is the formula for ring cutting?
Ring cutting formula is used to calculate the length of material required to cut a ring from a sheet of metal.
The formula for calculating the length of material required to cut a ring from a sheet of metal is: L = 2πr + 2h + wastage
Where L is the length of material required, r is the radius of the ring, h is the height of the ring, and wastage accounts for any additional material needed for cutting and joining the ring
For example, if you have a ring with a radius of 5 cm and ...read more

Asked in G R Infraprojects

Q. Code for stressing
Code for stressing
Use stress testing techniques to identify the maximum load a system can handle
Implement code that generates high levels of concurrent requests
Measure response times and resource utilization under stress conditions
Analyze the system's behavior and identify bottlenecks or performance issues

Asked in G R Infraprojects

Q. Bearing pedestal IS code
IS codes for bearing pedestals ensure structural integrity and design standards in civil engineering.
IS 456:2000 - General guidelines for design and construction of reinforced concrete structures.
IS 3370 - Code for concrete structures for storage of liquids, relevant for bearing pedestals in water tanks.
IS 800:2007 - General construction in steel, applicable for steel bearing pedestals.
IS 1343:1980 - Code for prestressed concrete, relevant for bearing pedestals in bridges.

Asked in Corrival Corporate Services

Q. What does M30 stand for?
M30 stands for the minimum compressive strength of concrete at 28 days.
M30 is a grade of concrete indicating its strength
It means the concrete will achieve a minimum compressive strength of 30 Mega Pascals (MPa) after 28 days of curing
Higher grades like M40, M50 indicate higher strength levels
Interview Experiences of Popular Companies








Reviews
Interviews
Salaries
Users

