Deputy Manager Project Management

10+ Deputy Manager Project Management Interview Questions and Answers

Updated 29 Mar 2025
search-icon

Q1. What is the Fe 500 grade steel with graph analysis.

Ans.

Fe 500 is a type of high-strength reinforcement steel used in construction.

  • Fe 500 is a type of TMT (thermo-mechanically treated) steel.

  • It has a minimum yield strength of 500 N/mm².

  • The graph analysis refers to the microstructure of the steel, which is analyzed to ensure its quality and strength.

  • Fe 500 grade steel is commonly used in construction for its high strength and durability.

  • It is suitable for use in reinforced concrete structures such as buildings, bridges, and dams.

Q2. How to fix Italian marble with technical specification

Ans.

Italian marble can be fixed by following technical specifications.

  • Identify the type of damage and select the appropriate adhesive.

  • Clean the surface of the marble thoroughly before applying the adhesive.

  • Apply the adhesive according to the manufacturer's instructions.

  • Allow the adhesive to dry completely before polishing the surface.

  • Ensure that the repaired area matches the color and pattern of the surrounding marble.

Deputy Manager Project Management Interview Questions and Answers for Freshers

illustration image

Q3. Minimum content of cement at concrete.?

Ans.

The minimum content of cement in concrete depends on the type of concrete and its intended use.

  • The minimum content of cement in concrete is typically 10-15% by weight.

  • For high-strength concrete, the minimum cement content may be higher, up to 20-25%.

  • The type of cement used also affects the minimum content, with some types requiring more cement than others.

  • The intended use of the concrete also plays a role, with structural concrete requiring a higher minimum cement content tha...read more

Q4. How to manage cross functional team?

Ans.

Managing cross-functional teams requires clear communication, collaboration, and a shared understanding of goals and expectations.

  • Establish clear roles and responsibilities for each team member

  • Encourage open communication and active listening

  • Set clear goals and expectations for the project

  • Create a shared understanding of project timelines and milestones

  • Provide regular feedback and recognition for team members

  • Resolve conflicts quickly and fairly

  • Celebrate team successes and lea...read more

Are these interview questions helpful?

Q5. What is the sequence of construction activities?

Ans.

Construction activities follow a systematic sequence to ensure project efficiency and quality.

  • 1. Site Preparation: Clearing and grading the land to create a suitable foundation.

  • 2. Foundation Work: Pouring concrete and setting up footings to support the structure.

  • 3. Superstructure Construction: Erecting walls, beams, and floors.

  • 4. Roofing: Installing the roof structure and covering materials.

  • 5. MEP Installation: Setting up mechanical, electrical, and plumbing systems.

  • 6. Interi...read more

Q6. Types of ply with Is code reference.

Ans.

There are different types of ply used in construction as per IS codes.

  • IS 303: Marine Plywood

  • IS 710: BWP (Boiling Water Proof) Plywood

  • IS 303: MR (Moisture Resistant) Plywood

  • IS 4990: Fire Retardant Plywood

  • IS 1659: Structural Plywood

  • IS 1328: Flexible Plywood

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. How will cost control on site ?

Ans.

Effective cost control on site involves monitoring expenses, optimizing resources, and implementing strategies to minimize waste.

  • Regularly review project budgets and forecasts to identify variances.

  • Implement a robust procurement process to ensure competitive pricing for materials.

  • Conduct weekly site meetings to assess progress and address any financial concerns.

  • Utilize technology, such as project management software, to track expenses in real-time.

  • Encourage a culture of cost ...read more

Q8. Do you know what is merger

Ans.

A merger is a combination of two or more companies into a single entity.

  • Merger is a corporate strategy where two or more companies combine to form a new company

  • It is a way to expand business operations, increase market share, and reduce competition

  • Merger can be of different types such as horizontal, vertical, conglomerate, etc.

  • Example: The merger of Disney and Pixar in 2006

  • Example: The merger of Exxon and Mobil in 1999

Deputy Manager Project Management Jobs

Deputy Manager-Project sales _Navi Mumbai 3-8 years
Accord Synergy
3.7
Thane
Assistant / Deputy Manager - Project Management 3-8 years
Apitoria Pharma Pvt. Ltd.
4.4
Hyderabad / Secunderabad
Assistant Manager/Deputy Manager-Projects 8-12 years
Global Calcium Pvt. Ltd
3.3
Hosur

Q9. How to manage a -ve client

Ans.

Managing a negative client requires effective communication, empathy, and problem-solving skills.

  • Listen actively to their concerns and acknowledge their frustrations

  • Empathize with their situation and offer solutions to address their issues

  • Set clear expectations and boundaries for communication and project scope

  • Document all communication and agreements to avoid misunderstandings

  • Involve senior management or a mediator if necessary to resolve conflicts

  • Maintain a professional and...read more

Q10. Do you know about shrinkage

Ans.

Shrinkage refers to the difference between the expected output and the actual output of a process.

  • It is commonly used in call centers to measure the difference between the scheduled time and the actual time agents spend on calls

  • It can also refer to the loss of inventory due to theft, damage, or spoilage

  • Shrinkage can be calculated as a percentage of the expected output

  • It is important to identify and reduce shrinkage to improve efficiency and profitability

Q11. Billing process of clients

Ans.

The billing process of clients involves invoicing for services rendered and collecting payment.

  • Invoicing should be done promptly and accurately

  • Payment terms should be clearly communicated to clients

  • Follow up with clients on overdue payments

  • Maintain accurate records of billing and payments

  • Consider offering payment options such as online payments or payment plans

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 77 Interviews
3.8
 • 30 Interviews
3.9
 • 15 Interviews
3.3
 • 11 Interviews
3.8
 • 2 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Deputy Manager Project Management Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter