i
AECOM
Filter interviews by
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I am available for the project and can commit to the required time and effort.
I am currently not committed to any other projects
I have the necessary skills and experience to contribute effectively
I am willing to adjust my schedule if needed for the project
I am excited about the opportunity to work on this project
Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.
Abutments provide support at the ends of a bridge.
Piers support the bridge deck in the middle.
Deck is the surface that vehicles travel on.
Superstructure includes beams, girders, and trusses.
Substructure supports the superstructure and transfers loads to the foundation.
Foundation transfers the bridge loads to the ground.
Ex...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liquid or
The major bridge I executed had a continuous span arrangement with multiple spans.
The major bridge had a continuous span arrangement with multiple spans
The span arrangement was designed to accommodate the required length and load capacity
The spans were connected seamlessly to ensure structural integrity and stability
Top trending discussions
posted on 15 Jun 2024
I applied via Approached by Company and was interviewed in Aug 2022. There was 1 interview round.
Design of PSC Girder involves several steps for both pre and post tensioned girders.
Determine the span length and load requirements
Select the cross-sectional shape and dimensions
Calculate the required prestressing force and tendon layout
Design the reinforcement for the non-prestressed section
Analyze the girder for serviceability and ultimate limit states
Check deflection, cracking, and shear capacity
Prepare detailed dra...
posted on 8 Jul 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
posted on 16 Feb 2025
I was interviewed before Feb 2024.
One newton is equal to 100,000 dynes.
One newton is the force required to accelerate a mass of one kilogram by one meter per second squared.
One dyne is the force required to accelerate a mass of one gram by one centimeter per second squared.
To convert newtons to dynes, multiply the value in newtons by 100,000.
posted on 29 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
posted on 29 Dec 2023
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Cement test, bitumen test, road density, ravite, autocad
Concrete properties grade
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Project Engineer
222
salaries
| ₹6.5 L/yr - ₹19.5 L/yr |
Senior Engineer
192
salaries
| ₹7.6 L/yr - ₹30 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹9.4 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
126
salaries
| ₹3.5 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley