I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
The major bridge uses driven piles as the primary piling methodology.
Driven piles are commonly used in major bridge construction.
They are installed by hammering or vibrating the pile into the ground.
Driven piles provide strong support and are suitable for various soil conditions.
Examples of driven piles include steel H-piles and concrete piles.
Girder pre stressing system is a method of applying tension to the steel girders to increase their load-carrying capacity.
Girder pre stressing system involves the use of high-strength steel cables or tendons that are tensioned and anchored to the girder.
The tension in the cables creates a compressive force in the girder, which increases its load-carrying capacity.
The maximum applied pressure in girder pre stressing sys...
Top trending discussions
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
I applied via Job Fair and was interviewed before Jun 2022. There were 5 interview rounds.
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I am available for the project and can commit to the required time and effort.
I am currently not committed to any other projects
I have the necessary skills and experience to contribute effectively
I am willing to adjust my schedule if needed for the project
I am excited about the opportunity to work on this project
Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.
Abutments provide support at the ends of a bridge.
Piers support the bridge deck in the middle.
Deck is the surface that vehicles travel on.
Superstructure includes beams, girders, and trusses.
Substructure supports the superstructure and transfers loads to the foundation.
Foundation transfers the bridge loads to the ground.
Ex...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liquid or
The major bridge I executed had a continuous span arrangement with multiple spans.
The major bridge had a continuous span arrangement with multiple spans
The span arrangement was designed to accommodate the required length and load capacity
The spans were connected seamlessly to ensure structural integrity and stability
I applied via Campus Placement and was interviewed before Jun 2023. There were 3 interview rounds.
Basic Technical, Logical reasoning
I applied via Referral and was interviewed in Dec 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in Feb 2022. There were 3 interview rounds.
I have experience in boiler pressure and pipe fittings alignment as per ASME section.
I have worked with various types of boilers and pressure vessels.
I am familiar with ASME Section I and Section VIII codes and standards.
I have experience in aligning pipe fittings such as flanges, elbows, and tees.
I am knowledgeable in using alignment tools such as dial indicators and laser alignment systems.
I have ensured that all ins...
based on 2 reviews
Rating in categories
Bridge Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Highway Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Support Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Bridge Design Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
TCE
L&T Technology Services
Jacobs Engineering Group