Filter interviews by
Top trending discussions
Group discussion hona chahiye daily
posted on 10 Jun 2022
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
I have 5 years of experience as a Project Engineer Civil. My skills include project management, structural design, and construction supervision.
5 years of experience as a Project Engineer Civil
Proficient in project management, structural design, and construction supervision
Managed multiple civil engineering projects from conception to completion
Developed and implemented project plans, budgets, and schedules
Collaborated...
I have worked on various civil engineering projects, specializing in project management and design.
Managed a team of engineers and contractors to successfully complete a bridge construction project within the given timeline and budget.
Designed and supervised the construction of a wastewater treatment plant, ensuring compliance with environmental regulations.
Implemented innovative solutions to optimize the design and co...
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 17 Oct 2024
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
The weight of steel bars can be calculated by multiplying the volume of the steel bar by its density.
Calculate the volume of the steel bar by using the formula: Volume = (π * (Diameter)^2 * Length) / 4
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight of the steel bar
Workability refers to the ease and ability of a material to be worked with and manipulated during construction.
Workability is important in construction as it affects the ease of placing, compacting, and finishing concrete or other materials.
Factors affecting workability include water content, aggregate size and shape, temperature, and admixtures.
For example, a concrete mix with high workability will flow easily into fo...
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
It is prepared by civil engineers to ensure proper placement and bending of reinforcement bars in concrete structures.
Includes details such as bar mark, diameter, number of bars, length, shape codes, and bending dimensions.
Helps in estimating the quantity of steel required for construction...
The density of steel bars is approximately 7850 kg/m^3.
The density of steel bars is typically around 7850 kg/m^3.
Density can vary slightly depending on the specific type of steel used.
Density is a measure of mass per unit volume.
The mix ratio of grade M20 concrete is 1:1.5:3 (cement:sand:aggregate).
Grade M20 concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).
This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.
For example, for a 1 cubic meter of M20 concrete, 0.5 cubic meters of sand and 1.5 cubic meters of aggregate are used.
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.
We executed a civil engineering project involving construction of a new bridge.
The project involved designing and constructing a new bridge over a river.
We conducted soil tests and analyzed the site to determine the best location for the bridge.
We used advanced software to create 3D models of the bridge and simulate its performance under different conditions.
We worked closely with local authorities and stakeholders to ...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Maintain regular communication and interaction with all staff members.
Regularly check in with staff to ensure they have the resources and support they need
Hold regular team meetings to discuss project progress and address any concerns
Encourage open communication and feedback from all team members
Provide opportunities for team building and collaboration
Lead by example by being accessible and approachable to all staff me
Interview experience
based on 6 reviews
Rating in categories
Deputy Manager
607
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
427
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Construction Engineer
304
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Civil Site Engineer
227
salaries
| ₹1.5 L/yr - ₹9 L/yr |
Safety Officer
225
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra