Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Adani Group Project Engineer - Civil Interview Questions and Answers

Updated 14 Oct 2023

Adani Group Project Engineer - Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me some concrete test
  • Ans. 

    Some concrete tests include slump test, compressive strength test, and water absorption test.

    • Slump test measures the consistency and workability of fresh concrete.

    • Compressive strength test determines the strength of hardened concrete.

    • Water absorption test assesses the porosity of concrete.

    • Ultrasonic pulse velocity test measures the quality of concrete by assessing its homogeneity and detecting defects.

    • Rebound hammer te...

  • Answered by AI
  • Q2. Tell me about yourself
  • Q3. Your father name
Round 3 - Group Discussion 

About civil knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - think positive

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Only Quality related

Interview Preparation Tips

Interview preparation tips for other job seekers - Superrbbbbb.

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Why do you think you are fit for the role?

Interview Questionnaire 

2 Questions

  • Q1. Have you worked with Foreign Clients
  • Q2. How good is your design and skills in Solar Industry
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Favourite product
  • Q2. Things one like about the product
  • Q3. Top problems with the product and solution
  • Ans. 

    Top problems with the product include slow loading times, frequent crashes, and lack of user-friendly interface.

    • Slow loading times can frustrate users and lead to decreased usage of the product.

    • Frequent crashes can result in loss of data and negative user experience.

    • Lack of user-friendly interface can make it difficult for users to navigate the product and find desired features.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Introduction and previous work ex
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical Round
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical details asked
Round 4 - One-on-one 

(1 Question)

  • Q1. Past experience details taken

Interview Preparation Tips

Interview preparation tips for other job seekers - Your profile should be perfectly matched and should be technically sound in your area

Adani Group Interview FAQs

How many rounds are there in Adani Group Project Engineer - Civil interview?
Adani Group interview process usually has 3 rounds. The most common rounds in the Adani Group interview process are Resume Shortlist, Technical and Group Discussion.

Tell us how to improve this page.

Adani Group Project Engineer - Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 226 Interviews
Tata Power Interview Questions
3.9
 • 164 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Torrent Power Interview Questions
3.7
 • 131 Interviews
Suzlon Group Interview Questions
4.1
 • 130 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Hitachi Energy Interview Questions
4.1
 • 85 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
Enphase Energy Interview Questions
2.9
 • 42 Interviews
View all

Adani Group Project Engineer - Civil Reviews and Ratings

based on 2 reviews

3.8/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

4.5

Salary

2.2

Job security

3.3

Company culture

3.0

Promotions

3.3

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
756 salaries
unlock blur

₹6 L/yr - ₹18.5 L/yr

Deputy Manager
508 salaries
unlock blur

₹6.4 L/yr - ₹20.3 L/yr

Associate Manager
313 salaries
unlock blur

₹10 L/yr - ₹29 L/yr

Manager
243 salaries
unlock blur

₹11 L/yr - ₹34 L/yr

Senior Engineer
230 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Adani Group with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview