L&T Metro Rail Assistant Project Manager Interview Questions and Answers

Updated 9 Apr 2021

L&T Metro Rail Assistant Project Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. In case of Incomer failure how will you restore Auxiliary Supply
  • Ans. 

    In case of Incomer failure, auxiliary supply can be restored by following these steps.

    • Check the power source and ensure it is functioning properly.

    • Identify the cause of the incomer failure and rectify it.

    • Switch to the backup power source.

    • Ensure that the auxiliary supply is stable and functioning properly.

    • Monitor the system to ensure that there are no further issues.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a technical question but interviewer want to know the in depth knowledge of maintenance also. They were checked communication skill also.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions, like introduce yourself
Round 3 - Technical 

(4 Questions)

  • Q1. Electrical engineering questions, HVAC, Vesta, and Fire fighting questions,
  • Q2. As per the SLD difine the process of equipment
  • Q3. HVAC how can you calculate the are for AC
  • Ans. 

    The area for AC can be calculated by multiplying the length and width of the room.

    • Measure the length and width of the room in feet or meters

    • Multiply the length by the width to get the area in square feet or square meters

    • For example, if the room is 10 feet long and 12 feet wide, the area for AC would be 120 square feet

  • Answered by AI
  • Q4. Load list, FIre fighting baisc questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont be over smart, simple if you don't know, something say I don know,

Tell us how to improve this page.

Assistant Manager
24 salaries
unlock blur

₹5.3 L/yr - ₹11 L/yr

Senior Engineer
10 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Manager
7 salaries
unlock blur

₹12.5 L/yr - ₹27 L/yr

Senior Civil Engineer
6 salaries
unlock blur

₹5.7 L/yr - ₹6.6 L/yr

Station Controller
6 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Explore more salaries
Compare L&T Metro Rail with

Delhi Metro Rail Corporation

4.1
Compare

Mumbai Metro One

3.7
Compare

Bangalore Metro Rail Corporation

3.8
Compare

Chennai Metro Rail

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview