I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. In case of Incomer failure how will you restore Auxiliary Supply
  • Ans. 

    In case of Incomer failure, auxiliary supply can be restored by following these steps.

    • Check the power source and ensure it is functioning properly.

    • Identify the cause of the incomer failure and rectify it.

    • Switch to the backup power source.

    • Ensure that the auxiliary supply is stable and functioning properly.

    • Monitor the system to ensure that there are no further issues.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a technical question but interviewer want to know the in depth knowledge of maintenance also. They were checked communication skill also.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Consists of 10 questions

Round 2 - Coding Test 

Consists of 20 questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Describe your technical knowledge about pipe line
  • Ans. 

    I have a strong technical knowledge about pipeline design, construction, and maintenance.

    • I am familiar with different types of pipelines such as oil, gas, water, and sewage pipelines.

    • I have experience in designing pipeline routes, selecting materials, and calculating pressure drops.

    • I am knowledgeable about pipeline construction techniques, including welding, trenching, and backfilling.

    • I am skilled in pipeline inspectio...

  • Answered by AI
  • Q2. What is Bar vending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction.

    • It includes information like bar diameter, length, shape, and number of bars required for each structural element.

    • It helps in estimating the quantity of steel required for a project and ensures that the reinforcement is placed correctly.

    • It is prepared by a structural engineer or a detailer and is used by the site e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident about your knowledge .You should be aware of the work of the firm you are going to and keep your behavior good.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Some question-related .net and SQL
Round 2 - HR 

(1 Question)

  • Q1. Do you have any offer

Interview Preparation Tips

Interview preparation tips for other job seekers - before Interview Please learn about .Net and SQL
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions, like introduce yourself
Round 3 - Technical 

(4 Questions)

  • Q1. Electrical engineering questions, HVAC, Vesta, and Fire fighting questions,
  • Q2. As per the SLD difine the process of equipment
  • Q3. HVAC how can you calculate the are for AC
  • Ans. 

    The area for AC can be calculated by multiplying the length and width of the room.

    • Measure the length and width of the room in feet or meters

    • Multiply the length by the width to get the area in square feet or square meters

    • For example, if the room is 10 feet long and 12 feet wide, the area for AC would be 120 square feet

  • Answered by AI
  • Q4. Load list, FIre fighting baisc questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont be over smart, simple if you don't know, something say I don know,
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About my background and salary
Round 2 - Technical 

(1 Question)

  • Q1. All my work experience and about electrical works

Interview Questionnaire 

1 Question

  • Q1. Question related to your field and technical knowledge

Interview Questionnaire 

1 Question

  • Q1. I was asked about my soft skills and my perfection in C/C++ programming language

Interview Preparation Tips

Round: HR Interview
Experience: My soft skills are average. Not extraordinary and I have a command over C. This helped me with this

College Name: Jaypee University Of Information Technology
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Be well-versed with C, SDLC and protocol standards
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Storage classes, Volatile, Programs on arrays
  • Q2. Describe my project
  • Q3. SDLC in general
  • Ans. 

    SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.

    • SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.

    • Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.

    • Examples of SDLC models include...

  • Answered by AI
  • Q4. CAN protocol functionality
  • Ans. 

    CAN protocol is a communication standard used in automotive and industrial applications.

    • CAN protocol stands for Controller Area Network

    • It is a message-based protocol used for communication between electronic control units (ECUs)

    • CAN protocol allows for high-speed communication and real-time data transmission

    • It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...

  • Answered by AI

Skills evaluated in this interview

Tell us how to improve this page.

Assistant Manager
23 salaries
unlock blur

₹5.3 L/yr - ₹12 L/yr

Senior Engineer
10 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Manager
7 salaries
unlock blur

₹12.5 L/yr - ₹27 L/yr

Senior Civil Engineer
6 salaries
unlock blur

₹5.7 L/yr - ₹6.6 L/yr

Station Controller
6 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Explore more salaries
Compare L&T Metro Rail with

Bombardier Transportation

4.2
Compare

Indira Gandhi International Airport

3.9
Compare

Indian Railway Catering and Tourism

4.0
Compare

Hyva

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview