Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
I plan my marketing media calendar by analyzing target audience, setting goals, selecting channels, and scheduling content.
Identify target audience and their preferences
Set marketing goals and objectives
Select appropriate marketing channels (social media, email, print, etc.)
Create a content schedule based on channel and audience
Track and analyze results to adjust future plans
I applied via Campus Placement and was interviewed before Jun 2023. There were 2 interview rounds.
Campus placement - aptitude - quantitative, logical reasoning
Motor working principle involves the interaction between magnetic fields to produce mechanical motion.
Electric current flows through coils in the motor, creating a magnetic field.
This magnetic field interacts with the permanent magnets in the motor, causing a rotational motion.
The direction of the current determines the direction of the rotation.
Motors can be AC or DC, with different designs for each type.
Growth prospects refer to the potential for a company to expand and increase its revenue and profitability over time.
Growth prospects are influenced by various factors such as market demand, competition, industry trends, and economic conditions.
Companies with strong growth prospects may have a competitive advantage, innovative products or services, or a solid financial position.
Investors and stakeholders often evaluate...
L&T Metro Rail interview questions for popular designations
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
Get interview-ready with Top L&T Metro Rail Interview Questions
posted on 17 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.
In case of Incomer failure, auxiliary supply can be restored by following these steps.
Check the power source and ensure it is functioning properly.
Identify the cause of the incomer failure and rectify it.
Switch to the backup power source.
Ensure that the auxiliary supply is stable and functioning properly.
Monitor the system to ensure that there are no further issues.
I applied via Campus Placement and was interviewed before Dec 2019. There was 1 interview round.
BMS stands for Building Management System and PLCs stands for Programmable Logic Controllers.
BMS is a computer-based control system that manages and monitors a building's mechanical and electrical equipment.
PLCs are industrial control systems that automate processes and machinery in manufacturing and other industries.
BMS and PLCs work together to control and optimize a building's energy usage and equipment performance.
...
Top trending discussions
I was interviewed in Feb 2025.
based on 3 interviews
Interview experience
based on 93 reviews
Rating in categories
Assistant Manager
23
salaries
| ₹5.3 L/yr - ₹12 L/yr |
Senior Engineer
10
salaries
| ₹5 L/yr - ₹9 L/yr |
Manager
7
salaries
| ₹12.5 L/yr - ₹27 L/yr |
Senior Civil Engineer
6
salaries
| ₹5.7 L/yr - ₹6.6 L/yr |
Station Controller
6
salaries
| ₹2.5 L/yr - ₹4.6 L/yr |
Delhi Metro Rail Corporation
Mumbai Metro One
Bangalore Metro Rail Corporation
Chennai Metro Rail