i
Filter interviews by
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
The area for AC can be calculated by multiplying the length and width of the room.
Measure the length and width of the room in feet or meters
Multiply the length by the width to get the area in square feet or square meters
For example, if the room is 10 feet long and 12 feet wide, the area for AC would be 120 square feet
Delhi Integrated Multi Modal Transit System interview questions for popular designations
I applied via Referral and was interviewed before Apr 2022. There were 4 interview rounds.
Aptitude related quiz
Top trending discussions
posted on 26 Oct 2024
Led strategic assignments to drive revenue growth and market expansion.
Developed and implemented sales strategies to penetrate new markets
Negotiated partnerships and contracts to increase revenue streams
Analyzed market trends and competitor activities to identify growth opportunities
Led cross-functional teams to execute strategic initiatives
Implemented pricing strategies to maximize profitability
I have a proven track record of successfully adapting to niche industries like Aviation.
I have previous experience working in niche industries and have successfully adapted to their specific requirements.
I am a quick learner and have the ability to understand complex industry regulations and standards.
I have a strong network within the aviation industry which helps me stay updated on the latest trends and developments.
...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Plate weight can be calculated by multiplying the area of the plate by its density.
Calculate the area of the plate by multiplying its length and width.
Determine the density of the material of the plate.
Multiply the area by the density to get the weight of the plate.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
Calculate the total production time, including setup time, processing time, and downtime.
Determine the total number of units produced during that time period.
Divide the total production time by the total number of units produced to get the cycle time.
Cycle Time = Total Production Time / Total Number of Units Produce
posted on 18 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 30 May 2024
based on 109 reviews
Rating in categories
Assistant Manager
34
salaries
| ₹5.2 L/yr - ₹12 L/yr |
Assistant Engineer
22
salaries
| ₹3.7 L/yr - ₹6.5 L/yr |
Deputy Manager
22
salaries
| ₹9 L/yr - ₹14.4 L/yr |
Assistant Officer
16
salaries
| ₹2.1 L/yr - ₹3.5 L/yr |
Executive
15
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Bangalore Metropolitan Transport Corporation
Mumbai Metro One
Chennai Metro Rail
Kolkata Metro Rail Corporation