i
Filter interviews by
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
Top trending discussions
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 9 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.
In case of Incomer failure, auxiliary supply can be restored by following these steps.
Check the power source and ensure it is functioning properly.
Identify the cause of the incomer failure and rectify it.
Switch to the backup power source.
Ensure that the auxiliary supply is stable and functioning properly.
Monitor the system to ensure that there are no further issues.
posted on 23 Nov 2015
SDLC is a process followed by software development teams to design, develop and test high-quality software.
SDLC consists of several phases including planning, analysis, design, development, testing, deployment, and maintenance.
Each phase has its own set of deliverables and objectives.
SDLC models include Waterfall, Agile, and DevOps.
SDLC helps ensure that software is developed efficiently, on time, and within budget.
SDL...
Different software development models
Waterfall model
Agile model
Spiral model
V-model
Iterative model
RAD model
Prototype model
Incremental model
Waterfall model is a linear sequential approach to software development.
Advantages: clear and well-defined stages, easy to understand and manage, suitable for small projects with stable requirements
Disadvantages: inflexible, difficult to make changes once a stage is completed, testing is done only at the end, not suitable for large or complex projects
Stages: requirements gathering, design, implementation, testing, depl...
Agile is an iterative approach to software development that emphasizes flexibility and customer satisfaction.
Agile involves breaking down projects into smaller, more manageable chunks called sprints.
It prioritizes collaboration between developers, customers, and stakeholders.
It allows for changes and adjustments to be made throughout the development process.
It promotes continuous delivery and improvement.
Advantages ove...
Questions about my project, E-R diagram, C/C++ projects, and software development model used.
Explained my project and its E-R diagram
Shared my experience with C/C++ projects
Discussed the software development model used
Provided examples to support my answers
posted on 6 May 2019
I applied via Campus Placement and was interviewed before May 2018. There was 0 interview round.
I appeared for an interview before Aug 2016.
Switchgear is a combination of electrical disconnect switches, fuses, or circuit breakers used to control, protect, and isolate electrical equipment.
Switchgear is a general term for a collection of devices used to control, protect, and isolate electrical equipment.
Circuit breakers are a type of switchgear that automatically interrupts the flow of electric current when a fault is detected.
Switchgear can include disconne...
The interface between transformer and switch gears is the electrical connection and communication between the two components.
The transformer and switch gears are connected through electrical cables or busbars.
The switch gears control the flow of electrical power to and from the transformer.
The switch gears may include circuit breakers, relays, and protective devices.
The interface ensures proper coordination and protect...
The value of IBL of Transformer oil is the Insulating Breakdown Level.
IBL is a measure of the dielectric strength of transformer oil.
It indicates the maximum voltage that the oil can withstand before it breaks down and loses its insulating properties.
The IBL value is important for ensuring the safe and reliable operation of transformers.
Regular testing of transformer oil is necessary to monitor the IBL and detect any p...
I am currently earning $80,000 and I am looking for a salary in the range of $90,000 to $100,000.
My current salary is $80,000.
I am expecting a salary in the range of $90,000 to $100,000.
I am open to negotiation based on the overall compensation package.
Yes, I am ready for re-location.
I am open to moving to a new location for the right opportunity.
I have experience working in different cities and adapting to new environments.
I am willing to relocate to further my career and gain new experiences.
I understand the challenges that come with re-location and I am prepared to face them.
I have a flexible mindset and can easily adjust to new surroundings.
Negotiation is typically done before arrival to finalize terms and conditions.
Negotiations are usually conducted before the candidate arrives to ensure all terms are agreed upon in advance.
It is important to have a clear understanding of the offer and terms before accepting the job.
Discussing and finalizing details beforehand can help avoid misunderstandings or conflicts later on.
posted on 17 Dec 2020
I applied via Campus Placement and was interviewed before Dec 2019. There was 1 interview round.
BMS stands for Building Management System and PLCs stands for Programmable Logic Controllers.
BMS is a computer-based control system that manages and monitors a building's mechanical and electrical equipment.
PLCs are industrial control systems that automate processes and machinery in manufacturing and other industries.
BMS and PLCs work together to control and optimize a building's energy usage and equipment performance.
...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
34
salaries
| ₹5.2 L/yr - ₹11.2 L/yr |
Deputy Manager
24
salaries
| ₹9 L/yr - ₹14.4 L/yr |
Assistant Engineer
22
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Assistant Officer
16
salaries
| ₹2.1 L/yr - ₹3.6 L/yr |
Executive
15
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Bombardier Transportation
Indian Railway Catering and Tourism
Hyva
Linfox Logistics