i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
posted on 28 Jun 2024
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
Inter connection in Sikar Project
JHUNJHANU SEWER PROJECT
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
posted on 14 Feb 2023
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
posted on 20 Feb 2025
I was interviewed before Feb 2024.
I handle the team by fostering open communication, setting clear goals, providing support, and recognizing achievements.
Foster open communication within the team to ensure everyone is on the same page
Set clear goals and expectations for each team member to work towards
Provide support and resources to help team members succeed
Recognize and celebrate achievements to boost morale and motivation
I am open to any location that offers growth opportunities and a supportive team environment.
Open to relocation for the right opportunity
Prefer a location with a strong project management community
Interested in locations with access to professional development resources
Prioritize locations with a collaborative work culture
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 24 Jul 2023
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Assistant Manager
4.2k
salaries
| ₹5 L/yr - ₹18 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹21 L/yr |
Manager
1.1k
salaries
| ₹9.3 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra