Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
128
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Project Management Consultant
54
salaries
| ₹4.1 L/yr - ₹6.8 L/yr |
Manager
53
salaries
| ₹10 L/yr - ₹22.5 L/yr |
Senior Manager
46
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Deputy Manager
45
salaries
| ₹6 L/yr - ₹15 L/yr |
AECOM
AtkinsRealis
McDermott International
Bechtel