Premium Employer

i

This company page is being actively managed by Saipem Team. If you also belong to the team, you can get access from here

Saipem Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Saipem Construction Management Interview Questions and Answers

Updated 15 Feb 2023

Saipem Construction Management Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Because I am EX employees with this company.
  • Q2. When you are joining this project
  • Q3. I am ready to join Immediately.
Round 3 - Technical 

(1 Question)

  • Q1. Technical Questions.
Round 4 - es 

(2 Questions)

  • Q1. Yes, HR i asked me salary, but i Received the offer letter from GPS /Saipem and i will accept her offer kettrer .. In wall sing deportment they romped the document for 06 months unfortunately will DeMeo me...
  • Q2. They are always checking with my look ahead scheduler

Interview Preparation Tips

Interview preparation tips for other job seekers - I am EX Employer of the SAIPEM Thats why did not take an Interview.,

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Group Discussion 

Past Projects details to explain,

Round 3 - Technical 

(5 Questions)

  • Q1. Past Projects Technical
  • Q2. What type of Piling Mech your using previous project
  • Ans. 

    We used bored pile foundation method in our previous project.

    • Bored pile foundation method was used for piling in the previous project.

    • The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.

    • Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.

  • Answered by AI
  • Q3. What is the pile rig tark of Rig Mech
  • Ans. 

    The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.

    • Operating pile driving equipment efficiently

    • Maintaining and repairing equipment as needed

    • Ensuring safety protocols are followed during pile driving operations

  • Answered by AI
  • Q4. What is density of polymer,
  • Ans. 

    The density of a polymer refers to its mass per unit volume.

    • Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).

    • The density of a polymer can vary depending on factors such as its chemical composition and structure.

    • For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.

    • Higher density polymers tend to be more rigid and have higher melting points.

  • Answered by AI
  • Q5. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
  • Ans. 

    The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.

    • Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.

    • The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.

    • Water test details should include para...

  • Answered by AI

Skills evaluated in this interview

I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Prepare your self as per your CV.
  • Q2. They required deep answer of every questions.
  • Q3. Time Cycle plan also discussed for every activities done in last projects.
Round 3 - HR 

(3 Questions)

  • Q1. Salary, reason of leaving, location
  • Q2. Documents Verification
  • Q3. Medical tests done at your nearest location by company expense.

Interview Preparation Tips

Topics to prepare for L&T Construction Construction Management interview:
  • As per CV
  • Work done in last projects
Interview preparation tips for other job seekers - Keep your self ready & up to date in technical as well managerial skills also, be honest & dedicated in your every project, prepare CV as per your knowledge & interest.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Structural engineering
  • Q2. Experience and expertise

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI

I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All about done and mentioned in your CV.
Round 3 - Technical 

(1 Question)

  • Q1. All about mentioned in cv.
Round 4 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Tell me about yourself.
  • Q3. What are your strengths and weaknesses?
  • Q4. What are your salary expectations?
  • Q5. Share details of your previous job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sound in technical and confident.
Present yourself politely and with confidence.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Express yourself
Round 2 - HR 

(1 Question)

  • Q1. Location of work
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Mech engineering
  • Q2. All about rotatory parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Saipem Interview FAQs

How many rounds are there in Saipem Construction Management interview?
Saipem interview process usually has 4 rounds. The most common rounds in the Saipem interview process are Technical and Resume Shortlist.
What are the top questions asked in Saipem Construction Management interview?

Some of the top questions asked at the Saipem Construction Management interview -

  1. Yes, HR i asked me salary, but i Received the offer letter from GPS /Saipem and...read more
  2. They are always checking with my look ahead schedu...read more
  3. I am ready to join Immediate...read more

Tell us how to improve this page.

Saipem Construction Management Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Saipem Engineering for a sustainable future

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all

Saipem Construction Management Reviews and Ratings

based on 3 reviews

4.8/5

Rating in categories

4.6

Skill development

4.5

Work-life balance

4.6

Salary

4.6

Job security

4.8

Company culture

4.6

Promotions

4.8

Work satisfaction

Explore 3 Reviews and Ratings
Principal Engineer
175 salaries
unlock blur

₹9.2 L/yr - ₹29.5 L/yr

Senior Principal Engineer
108 salaries
unlock blur

₹14.3 L/yr - ₹33 L/yr

Senior Engineer
95 salaries
unlock blur

₹7 L/yr - ₹19 L/yr

Piping Designer
90 salaries
unlock blur

₹5 L/yr - ₹18 L/yr

Process Engineer
51 salaries
unlock blur

₹3.3 L/yr - ₹12 L/yr

Explore more salaries
Compare Saipem with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview