Q1. How much cost it would be for 25 acre land boundary wall

Ans.

The cost of building a boundary wall for a 25-acre land depends on various factors such as materials used, labor cost, and design.

  • The cost of materials such as bricks, cement, and steel will vary depending on the quality and quantity required.

  • The cost of labor will depend on the location of the land and the prevailing wage rates.

  • The design of the wall will also affect the cost, as more intricate designs will require more time and materials.

  • Other factors such as transportation...read more

Q2. How to complete piling scope in desired time, how much resources required and tome cycle

Ans.

To complete piling scope in desired time, proper planning, skilled labor, efficient equipment and adequate resources are required.

  • Develop a detailed project plan with clear timelines and milestones

  • Ensure availability of skilled labor and efficient equipment

  • Allocate adequate resources for the project

  • Regularly monitor progress and make necessary adjustments

  • Example: Use of hydraulic piling rigs can speed up the process and reduce manual labor

  • Example: Proper coordination between ...read more

Q3. What are test to be conducted for road construction

Ans.

Various tests are conducted for road construction to ensure quality and safety.

  • Compaction test to check the density of soil

  • CBR test to determine the strength of subgrade soil

  • Benkelman beam test to measure the deflection of pavement

  • Core cutting test to check the thickness and quality of pavement

  • Skid resistance test to evaluate the friction between the road surface and vehicle tires

  • Aggregate impact value test to determine the strength of aggregates

  • Bitumen penetration test to ch...read more

Q4. When will piling foundation considered for construction

Ans.

Piling foundation is considered when the soil is weak or unstable to support the weight of the structure.

  • Piling foundation is used when the soil is unable to bear the load of the structure

  • It is also used when the soil is too compressible or has a low bearing capacity

  • Piling foundation is commonly used in areas with high water tables or in coastal regions

  • Examples of structures that require piling foundation include high-rise buildings, bridges, and offshore structures

Are these interview questions helpful?

Q5. To meet Target at Site how to mitigate the delay Project Schedule

Ans.

To mitigate delays in project schedule, focus on proper planning, communication, resource allocation, and risk management.

  • Develop a detailed project schedule with clear milestones and deadlines.

  • Regularly communicate with all stakeholders to ensure everyone is on the same page.

  • Allocate resources effectively to prevent bottlenecks and delays.

  • Identify potential risks and have contingency plans in place to address them.

  • Regularly monitor progress and make adjustments as needed to ...read more

Q6. If project is in loss how you will optimise the losses

Ans.

To optimise losses in a project, I would focus on cost-cutting measures, renegotiating contracts, improving efficiency, and seeking alternative revenue streams.

  • Identify areas of overspending and implement cost-cutting measures such as reducing unnecessary expenses or finding cheaper alternatives

  • Renegotiate contracts with suppliers or subcontractors to lower costs

  • Improve efficiency by streamlining processes, reducing waste, and optimizing resource allocation

  • Seek alternative re...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. howmany piles used and how many length of span

Ans.

The number of piles used and length of span depend on the specific project requirements.

  • The number of piles used will depend on the load capacity required for the structure.

  • The length of span will depend on the distance between the supports and the load capacity required.

  • Factors such as soil conditions, environmental factors, and budget will also impact the number of piles and length of span.

  • For example, a bridge spanning a river may require more piles and a longer span than ...read more

Q8. How can you test strength after the final test?

Ans.

Strength can be tested through destructive and non-destructive methods.

  • Destructive methods include breaking or crushing the material to determine its ultimate strength.

  • Non-destructive methods include ultrasonic testing, magnetic particle inspection, and radiography.

  • Strength can also be tested through load testing, where a load is applied to the structure and its response is measured.

  • The results of these tests can be compared to industry standards and specifications to determi...read more

Q9. How to achieve target date if time frame is less

Ans.

To achieve target date with a shorter time frame, prioritize tasks, streamline processes, allocate resources effectively, and communicate effectively with the team.

  • Prioritize tasks based on their criticality and impact on the overall project timeline.

  • Streamline processes by eliminating unnecessary steps and optimizing workflows.

  • Allocate resources effectively by ensuring the right people with the necessary skills are assigned to the tasks.

  • Communicate effectively with the team ...read more

Q10. What is the time required to complete the wtp

Ans.

The time required to complete the WTP depends on various factors such as project scope, size, complexity, and resources.

  • The time required can range from a few months to a few years.

  • Factors such as site conditions, weather, availability of materials, and workforce can impact the project timeline.

  • Proper planning, scheduling, and efficient project management can help in completing the WTP within the estimated time frame.

Q11. For which building you are doing billing.

Ans.

We are currently doing billing for the new commercial complex in downtown.

  • We are working on a new commercial complex in downtown.

  • The billing process is ongoing for this project.

  • The project involves multiple contractors and subcontractors.

  • The building is expected to be completed in the next six months.

Q12. What is the water treatment process

Ans.

Water treatment process involves various steps to remove impurities and make water safe for consumption.

  • Coagulation and flocculation to remove suspended particles

  • Sedimentation to allow particles to settle at the bottom

  • Filtration to remove remaining particles

  • Disinfection using chlorine, UV light, or ozone to kill bacteria and viruses

  • pH adjustment to ensure water is not too acidic or basic

Q13. What are the Quality Test for Civil work

Ans.

Quality tests for civil work ensure that construction meets standards and specifications.

  • Concrete testing for compressive strength

  • Soil testing for bearing capacity

  • Steel reinforcement testing for tensile strength

  • Waterproofing testing for leakages

  • Asphalt testing for durability

Q14. How to calculate labor cost

Ans.

Labor cost can be calculated by multiplying the total hours worked by the labor rate.

  • Determine the total hours worked by each laborer

  • Identify the labor rate per hour

  • Multiply the total hours worked by the labor rate to get the labor cost

  • Consider any additional costs such as benefits or overtime pay

Q15. How to calculate material cost

Ans.

Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.

  • Determine the quantity of each material needed for the project

  • Obtain the unit cost of each material

  • Multiply the quantity of each material by its unit cost to get the total cost

  • Add up the total cost of all materials to get the overall material cost

Q16. Waste of energy and time

Ans.

Waste of energy and time can occur due to poor planning, lack of communication, inefficient processes, and procrastination.

  • Poor planning can lead to rework and delays in construction projects.

  • Lack of communication can result in misunderstandings and mistakes that require additional time and resources to fix.

  • Inefficient processes can cause workers to spend more time than necessary on tasks, wasting energy and time.

  • Procrastination can lead to rushed work and errors that need to...read more

Q17. What is your Prefer CTC

Ans.

My preferred CTC would be competitive with industry standards and reflective of my experience and skills.

  • Prefer a CTC that is competitive with industry standards

  • Consider my experience and skills when determining CTC

  • Open to negotiation based on benefits package and growth opportunities

Q18. MS & SS bolts fixing procedure

Ans.

The procedure for fixing MS & SS bolts involves several steps to ensure proper installation and structural integrity.

  • Start by selecting the appropriate bolt size and type based on the specific application and load requirements.

  • Prepare the holes by drilling or tapping them to the correct size and depth.

  • Clean the holes thoroughly to remove any debris or contaminants.

  • Insert the bolt into the hole and tighten it using the appropriate torque wrench or tool.

  • Ensure that the bolt is ...read more

Q19. PEB building cost estimation

Ans.

PEB building cost estimation involves various factors such as design, materials, labor, and location.

  • PEB buildings are pre-engineered metal buildings that are cost-effective and easy to construct.

  • The cost estimation for PEB buildings depends on the design complexity, materials used, labor costs, and location.

  • Factors such as insulation, roofing, cladding, and foundation also affect the cost estimation.

  • The cost estimation can be done using software tools that take into account ...read more

Q20. Specification of Bolt

Ans.

A bolt is a threaded fastener used to join two or more objects together.

  • Bolts are typically made of metal and have a cylindrical shape.

  • They have a threaded portion that allows them to be screwed into a corresponding threaded hole.

  • Bolts are commonly used in construction to secure structural elements such as beams, columns, and connections.

  • Different types of bolts include hex bolts, carriage bolts, and anchor bolts.

  • Bolt specifications may include dimensions, material grade, thr...read more

Q21. medical fitness by authorized hospitals

Ans.

Authorized hospitals conduct medical fitness tests for construction workers.

  • Construction workers must undergo medical fitness tests before starting work.

  • Authorized hospitals are responsible for conducting these tests.

  • The tests ensure that workers are physically fit to perform their duties safely.

  • Results of the tests are recorded and kept on file for future reference.

  • Workers may be required to undergo periodic medical check-ups to maintain their fitness.

Q22. Grade of concrete

Ans.

The grade of concrete refers to its strength and durability.

  • The grade of concrete is determined by its compressive strength.

  • Common grades of concrete include M10, M20, M30, etc.

  • The higher the grade, the stronger the concrete.

  • Different grades of concrete are used for different construction purposes.

  • For example, higher grade concrete is used in high-rise buildings.

Q23. Site work purpose

Ans.

Site work involves preparing the construction site for building, including clearing, grading, and excavation.

  • Clearing the site of any existing structures or debris

  • Grading the land to ensure proper drainage and foundation stability

  • Excavating for foundations, utilities, and other underground structures

  • Installing erosion control measures to prevent soil erosion

  • Preparing access roads and parking areas for construction vehicles

  • Landscaping and final site cleanup upon project comple...read more

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.0
 • 642 Interviews
4.2
 • 157 Interviews
4.0
 • 140 Interviews
4.0
 • 129 Interviews
4.1
 • 17 Interviews
3.7
 • 2 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Construction Manager Civil Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter