Filter interviews by
I was interviewed in Dec 2024.
Cement is a binding material used in construction to hold together bricks, stones, and other materials.
Cement is a fine powder made from limestone, clay, and other minerals.
When mixed with water, cement forms a paste that hardens and binds materials together.
Common types of cement include Portland cement, which is used in most construction projects.
Cement is a key ingredient in concrete, mortar, and grout.
Proper curing...
General aptitude questions
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Site administrative.
Cost and budget and agreed timeline.
URC Construction interview questions for popular designations
Get interview-ready with Top URC Construction Interview Questions
I applied via campus placement at Gandhi Institute for Technology Advancement, Bhuvaneshwar and was interviewed in Apr 2024. There were 3 interview rounds.
General knowledge and basic things about civil engineering.
Two topic given in which we have to choose one topic and start discussing in it.
I am a recent graduate with a degree in Civil Engineering, eager to learn and grow in the field of construction.
Recent graduate with a degree in Civil Engineering
Passionate about construction and eager to learn
Strong communication and problem-solving skills
Experience with CAD software and project management
Short term goal is to gain hands-on experience in site engineering. Long term goal is to become a successful and knowledgeable site engineer.
Short term goal: Gain practical experience in site engineering through on-site training and projects.
Long term goal: Develop expertise in site engineering, project management, and leadership skills to become a successful site engineer.
Short term goal example: Completing training p...
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I understand that being flexible with location can lead to more opportunities.
I have relocated in the past for job opportunities and have found it to be a positive experience.
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
Top trending discussions
Interview experience
based on 469 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
121
salaries
| ₹3 L/yr - ₹8.9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Assistant Manager
48
salaries
| ₹4.6 L/yr - ₹9.9 L/yr |
Civil Site Engineer
48
salaries
| ₹1.9 L/yr - ₹5.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group