Upload Button Icon Add office photos

Filter interviews by

URC Construction Assistant Engineer - Civil Interview Questions, Process, and Tips

Updated 18 Sep 2024

Top URC Construction Assistant Engineer - Civil Interview Questions and Answers

URC Construction Assistant Engineer - Civil Interview Experiences

4 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About Piling work and test for pile
  • Q2. About casting yard, segment and I-Girder

Interview Preparation Tips

Interview preparation tips for other job seekers - Best of luck 🤞
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What's BBS full form? And how to find weight of bar.
  • Ans. 

    BBS stands for Bar Bending Schedule. Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L, where D is diameter of bar in mm and L is length of bar in meters.

    • BBS stands for Bar Bending Schedule

    • Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L

    • D is diameter of bar in mm

    • L is length of bar in meters

  • Answered by AI
  • Q2. What's self compacting concrete?
  • Ans. 

    Self compacting concrete is a type of concrete that does not require vibration or compaction during placement.

    • Contains high flowability and segregation resistance

    • Achieves full compaction purely through its own weight and without the need for mechanical vibration

    • Ideal for complex structures with congested reinforcement or in areas with limited access

    • Reduces labor costs and construction time

    • Examples include SCC mixtures ...

  • Answered by AI
  • Q3. What's different between nominal mix and design mix?
  • Ans. 

    Nominal mix is a pre-defined mix ratio while design mix is a mix ratio calculated based on specific requirements.

    • Nominal mix uses pre-determined ratios like 1:2:4 for concrete, while design mix is calculated based on specific requirements like strength and durability.

    • Design mix involves testing of materials to determine the optimal mix ratio, while nominal mix does not require such testing.

    • Design mix is more precise an...

  • Answered by AI
  • Q4. What's w/c ratio? Explain me.
  • Ans. 

    w/c ratio stands for water-cement ratio, it is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • w/c ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower w/c ratio indicates a stronger and more durable concrete mix.

    • The w/c ratio should be carefully controlled to achieve the desired concrete properties.

    • For example, a w/c ratio of 0.5 means that for every

  • Answered by AI

Assistant Engineer - Civil Interview Questions Asked at Other Companies

asked in TCE
Q1. If the cubes are failed then what will you do ?
Q2. What is mixtatio of concrete, what are the type of IS code, what ... read more
asked in TCE
Q3. What kind of steel you used in previous project ?
Q4. Why water ratio in cement concrete mix is very essential part of ... read more
Q5. How many kg of cement does one m3 require and how many kg of ceme ... read more

I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Technical question Drawing test Mathematical approach
Round 2 - One-on-one 

(1 Question)

  • Q1. Pm met in this round and again he asked me technical questions and test my analytical skill
Round 3 - HR 

(1 Question)

  • Q1. Salary expectation Notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself Theoretically and be confident and be true
Round 1 - Aptitude Test 

20 questions regard core

Round 2 - Technical 

(1 Question)

  • Q1. Technical questions, experience related questions to be asked
Round 3 - Coding Test 

Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold and attend positively. Need little bit technical knowledge and core experience to face the interview. Be brave to ask salary negotiation. At salary point of view atand at you expectations

URC Construction interview questions for designations

 Civil Engineer

 (1)

 Civil Site Engineer

 (2)

 Junior Engineer Civil

 (2)

 Project Engineer - Civil

 (1)

 Civil Site Supervisor

 (1)

 Construction Manager Civil

 (1)

 Assistant Engineer

 (2)

 MEP Engineer

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell us about your self
Round 3 - One-on-one 

(2 Questions)

  • Q1. Technical questions rolling margin
  • Q2. Unit weight of steel
  • Ans. 

    Unit weight of steel is typically around 7850 kg/m^3.

    • Unit weight of steel is commonly used in civil engineering for calculating the weight of steel structures.

    • The unit weight of steel is typically around 7850 kg/m^3.

    • This value may vary slightly depending on the specific type of steel being used.

  • Answered by AI

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is hydration process during casting of concrete?
  • Ans. 

    Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.

    • Hydration process starts as soon as water is added to cement.

    • The reaction produces heat and causes the mixture to harden and gain strength.

    • The process continues for weeks and even months, resulting in a stronger and more durable concrete.

    • The amount of water used in the mixture affects the hydration process and...

  • Answered by AI
  • Q2. Concrete strength depend ?
  • Ans. 

    Concrete strength depends on various factors.

    • Water-cement ratio

    • Type and quality of cement

    • Aggregate size and shape

    • Curing conditions

    • Mix design

    • Age of concrete

    • Temperature and humidity

    • Presence of admixtures

  • Answered by AI
  • Q3. Why used send in concrete mixer
  • Ans. 

    Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.

    • Water is added to hydrate the cement and activate the chemical reaction that causes it to harden

    • The amount of water added affects the strength and durability of the concrete

    • Too much water can weaken the concrete and cause cracking

    • The water should be added gradually and mixed thoroughly to ensure even distribution

    • Ot...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM Assistant Engineer - Civil interview:
  • Environmental effect on concrete
Interview preparation tips for other job seekers - Please increase knowledge inhance of fresher and experienced
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Estimation of qantity
  • Ans. 

    Estimation of quantity is a crucial aspect of civil engineering projects.

    • Estimation of quantity involves calculating the amount of materials required for a project.

    • It is important to consider factors such as wastage, transportation, and storage when estimating quantities.

    • Various methods such as approximate quantities, detailed estimates, and cubic rate estimates can be used for estimation.

    • Software tools such as AutoCAD...

  • Answered by AI
  • Q2. Surveying ,levelling
  • Q3. Design mix and bbs of colum
  • Ans. 

    Design mix and BBS are important aspects of column construction.

    • Design mix refers to the proportion of materials used in the concrete mix for the column.

    • BBS or Bar Bending Schedule is a document that specifies the number, size, and shape of the reinforcement bars to be used in the column.

    • Design mix and BBS are crucial for ensuring the strength and durability of the column.

    • For example, a typical design mix for a column ...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. What is your Salary expectation
  • Q2. Reason to join company
  • Q3. Why u want to join company

Interview Preparation Tips

Topics to prepare for B. G. Shirke Construction Technology Assistant Engineer - Civil interview:
  • Survey
  • Quantity Estimation
  • Design mix
  • Bbs
  • Shuttering
Interview preparation tips for other job seekers - Strict to the basics of civil engineering for interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering
  • Q2. What is a structure
  • Ans. 

    A structure is a system or arrangement of parts that are interconnected and function together to support loads and resist forces.

    • Structures can be man-made or natural

    • They can be made of various materials such as steel, concrete, wood, etc.

    • Examples include buildings, bridges, dams, towers, etc.

  • Answered by AI
  • Q3. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.

    • Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.

    • Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.

    • Reinforced concrete contains steel reinforcement bars to increase its ...

  • Answered by AI
  • Q4. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures.

    • The mix proportions vary for different grades of concrete t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have confidence

Skills evaluated in this interview

URC Construction Interview FAQs

How many rounds are there in URC Construction Assistant Engineer - Civil interview?
URC Construction interview process usually has 2-3 rounds. The most common rounds in the URC Construction interview process are Technical, One-on-one Round and Aptitude Test.
What are the top questions asked in URC Construction Assistant Engineer - Civil interview?

Some of the top questions asked at the URC Construction Assistant Engineer - Civil interview -

  1. What's BBS full form? And how to find weight of b...read more
  2. What's different between nominal mix and design m...read more
  3. What's self compacting concre...read more

Tell us how to improve this page.

URC Construction Assistant Engineer - Civil Interview Process

based on 3 interviews

Interview experience

4.3
  
Good
View more
URC Construction Assistant Engineer - Civil Salary
based on 61 salaries
₹2.4 L/yr - ₹5.7 L/yr
13% less than the average Assistant Engineer - Civil Salary in India
View more details

URC Construction Assistant Engineer - Civil Reviews and Ratings

based on 15 reviews

3.6/5

Rating in categories

3.6

Skill development

2.2

Work-life balance

2.9

Salary

3.8

Job security

3.0

Company culture

2.6

Promotions

3.2

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
121 salaries
unlock blur

₹3 L/yr - ₹8.9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Civil Site Engineer
48 salaries
unlock blur

₹1.9 L/yr - ₹5.4 L/yr

Explore more salaries
Compare URC Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview