Upload Button Icon Add office photos

URC Construction

Compare button icon Compare button icon Compare

Filter interviews by

URC Construction Interview Questions, Process, and Tips

Updated 28 Feb 2025

Top URC Construction Interview Questions and Answers

View all 42 questions

URC Construction Interview Experiences

Popular Designations

58 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What's BBS full form? And how to find weight of bar.
  • Ans. 

    BBS stands for Bar Bending Schedule. Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L, where D is diameter of bar in mm and L is length of bar in meters.

    • BBS stands for Bar Bending Schedule

    • Weight of a bar can be calculated using the formula: Weight = (D^2/162) * L

    • D is diameter of bar in mm

    • L is length of bar in meters

  • Answered by AI
  • Q2. What's self compacting concrete?
  • Ans. 

    Self compacting concrete is a type of concrete that does not require vibration or compaction during placement.

    • Contains high flowability and segregation resistance

    • Achieves full compaction purely through its own weight and without the need for mechanical vibration

    • Ideal for complex structures with congested reinforcement or in areas with limited access

    • Reduces labor costs and construction time

    • Examples include SCC mixtures ...

  • Answered by AI
  • Q3. What's different between nominal mix and design mix?
  • Ans. 

    Nominal mix is a pre-defined mix ratio while design mix is a mix ratio calculated based on specific requirements.

    • Nominal mix uses pre-determined ratios like 1:2:4 for concrete, while design mix is calculated based on specific requirements like strength and durability.

    • Design mix involves testing of materials to determine the optimal mix ratio, while nominal mix does not require such testing.

    • Design mix is more precise an...

  • Answered by AI
  • Q4. What's w/c ratio? Explain me.
  • Ans. 

    w/c ratio stands for water-cement ratio, it is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • w/c ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower w/c ratio indicates a stronger and more durable concrete mix.

    • The w/c ratio should be carefully controlled to achieve the desired concrete properties.

    • For example, a w/c ratio of 0.5 means that for every

  • Answered by AI

Assistant Engineer - Civil Interview Questions asked at other Companies

Q1. If the cubes are failed then what will you do ?
View answer (7)
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the cube test acceptance criteria
  • Ans. 

    The cube test acceptance criteria is a set of standards used to determine if a cube specimen meets the required strength for construction purposes.

    • The acceptance criteria typically involves comparing the compressive strength of the cube specimen to a specified minimum value.

    • The cube test acceptance criteria may also include factors such as curing conditions, testing procedures, and age of the specimen.

    • For example, a co...

  • Answered by AI
  • Q2. How many HT strands required according to specifications
  • Ans. 

    The number of HT strands required depends on the specifications provided for the project.

    • The number of HT strands required will vary based on the voltage rating, current carrying capacity, and insulation requirements of the project.

    • Consult the project specifications to determine the exact number of HT strands needed.

    • For example, a project with a higher voltage rating may require more HT strands to meet the necessary in...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Concrete crack repairing procedure
  • Ans. 

    Concrete crack repairing involves cleaning the crack, filling it with a suitable material, and sealing it to prevent further damage.

    • Clean the crack thoroughly to remove any debris or loose material

    • Fill the crack with a suitable material such as epoxy or polyurethane

    • Seal the crack with a concrete sealer to prevent water infiltration and further damage

  • Answered by AI
  • Q2. Cube failure remedial action

Assistant General Manager Interview Questions asked at other Companies

Q1. It is observed that most of our Indian Bank's NIM is declining over the years. what could be some alternate revenue model for banks for boosting overall income to compensate for the declining NIM?
View answer (2)
URC Construction Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Ans. 

    The interview process was thorough and challenging, but overall a positive experience.

    • The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.

    • I was asked to discuss my previous projects and experiences in detail.

    • There were questions about problem-solving skills and how I handle challenging situations on site.

    • Overall, the interviewers were professional and provided a clear

  • Answered by AI
  • Q2. What are your salary expectations?
  • Ans. 

    My salary expectations are in line with industry standards and based on my experience and qualifications.

    • Research industry standards for Civil Site Engineers in the specific location

    • Consider years of experience and level of qualifications

    • Be prepared to negotiate based on job responsibilities and benefits package

  • Answered by AI
  • Q3. Why you last company leave
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Opportunity for professional growth

    • Company restructuring or downsizing

    • Relocation to a new city

  • Answered by AI

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About u r self
  • Q2. What is cement and explain about it
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • When mixed with water, cement forms a paste that hardens and binds materials together.

    • Common types of cement include Portland cement, which is used in most construction projects.

    • Cement is a key ingredient in concrete, mortar, and grout.

    • Proper curing...

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

URC Construction interview questions for popular designations

 Assistant Engineer - Civil

 (4)

 Construction Management

 (2)

 Assistant Engineer

 (2)

 Senior Engineer

 (2)

 Junior Engineer Civil

 (2)

 Civil Site Engineer

 (2)

 HR Executive

 (1)

 Project Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General aptitude questions

Round 2 - Technical 

(2 Questions)

  • Q1. General technical
  • Q2. Deep Core technical questions
Round 3 - HR 

(1 Question)

  • Q1. Basic HR questions

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Get interview-ready with Top URC Construction Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About work procedures
  • Q2. Resources arrangements.
Round 2 - Assignment 

Site administrative.

Round 3 - Assignment 

Cost and budget and agreed timeline.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company. But working style very hard.

Jobs at URC Construction

View all
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. MEP DESIGN RELATED QUESTION

Senior Electrical Engineer Interview Questions asked at other Companies

Q1. 1. What IEC standard you are using for designing the panels, for selection of switchgear.
View answer (1)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General knowledge and basic things about civil engineering.

Round 2 - Group Discussion 

Two topic given in which we have to choose one topic and start discussing in it.

Round 3 - HR 

(3 Questions)

  • Q1. Tell me about your self?
  • Ans. 

    I am a recent graduate with a degree in Civil Engineering, eager to learn and grow in the field of construction.

    • Recent graduate with a degree in Civil Engineering

    • Passionate about construction and eager to learn

    • Strong communication and problem-solving skills

    • Experience with CAD software and project management

  • Answered by AI
  • Q2. Short term and long term goal?
  • Ans. 

    Short term goal is to gain hands-on experience in site engineering. Long term goal is to become a successful and knowledgeable site engineer.

    • Short term goal: Gain practical experience in site engineering through on-site training and projects.

    • Long term goal: Develop expertise in site engineering, project management, and leadership skills to become a successful site engineer.

    • Short term goal example: Completing training p...

  • Answered by AI
  • Q3. Are you ready to relocated in any place ?
  • Ans. 

    Yes, I am willing to relocate for the right opportunity.

    • I am open to relocating for career growth and new experiences.

    • I understand that being flexible with location can lead to more opportunities.

    • I have relocated in the past for job opportunities and have found it to be a positive experience.

  • Answered by AI

Trainee Site Engineer Interview Questions asked at other Companies

Q1. Various apparatus use in civil engineering Various grade of materials Density of various construction materials Steps of a structure Types of pipes, steel , bricks,
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Bar Bending Schedule
  • Q2. Find out shuttering Area
  • Ans. 

    Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.

    • Calculate the surface area of each individual formwork used for the concrete structure

    • Add up the surface areas of all formworks to get the total shuttering area

    • Consider any openings or gaps in the formwork when calculating the area

  • Answered by AI
  • Q3. Semi circle area formula
  • Ans. 

    The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.

    • The formula for the area of a semi-circle is (1/2) * pi * r^2

    • The radius (r) is half the diameter of the circle

    • Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Why u want to join this company ?
  • Q2. Why u want to quit Your present company
  • Q3. About my Salary

Top URC Construction Assistant Engineer Interview Questions and Answers

Q1. Amount of binding wire to be used per tone of reinforcement
View answer (1)

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Pannel arrection knowledge
  • Q2. Drawing knowledge
  • Q3. Site supervision
  • Q4. Workers controlling
  • Q5. Daucument work timely completed

Electrical Supervisor Interview Questions asked at other Companies

Q1. Tell me about HT LT and Dg Transformer, how to do load changeover
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is safety in construction site
  • Ans. 

    Safety in construction site involves implementing measures to prevent accidents and injuries.

    • Ensuring all workers are properly trained on safety procedures

    • Regular inspections of equipment and machinery

    • Providing personal protective equipment (PPE) to all workers

    • Implementing fall protection measures for working at heights

    • Creating emergency response plans and conducting drills

    • Enforcing strict adherence to safety regulatio

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - At the job location then

Safety Supervisor Interview Questions asked at other Companies

Q1. 1> What is Difference between Accident v/s Incident ? 2> What is Hazard ? 3> What is fire and types of Fire ? 4> Tell me about Confined Space ? 5> what is near Miss ? 6> What Is Excavation Safety ? 7> What is work permi... read more
View answer (3)
Contribute & help others!
anonymous
You can choose to be anonymous

URC Construction Interview FAQs

How many rounds are there in URC Construction interview?
URC Construction interview process usually has 2-3 rounds. The most common rounds in the URC Construction interview process are Technical, HR and Resume Shortlist.
How to prepare for URC Construction interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at URC Construction. The most common topics and skills that interviewers at URC Construction expect are MSP, Project Control, MS Project, P6 and Scheduling.
What are the top questions asked in URC Construction interview?

Some of the top questions asked at the URC Construction interview -

  1. What is the name of two hydra used shift materials...read more
  2. What's BBS full form? And how to find weight of b...read more
  3. In How much square metres shuttering will be done in 1carpenter & 1helper per d...read more
How long is the URC Construction interview process?

The duration of URC Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

URC Construction

No Interviews

INTERVIEWS

URC Construction

No Interviews

INTERVIEWS

Shanghai Tunnel Engineering

No Interviews

INTERVIEWS

URC Construction

No Interviews

INTERVIEWS

Telecom Network Solutions

No Interviews

INTERVIEWS

URC Construction

No Interviews

INTERVIEWS

Telecom Network Solutions

10 top interview questions

INTERVIEWS

URC Construction

No Interviews

LIST OF COMPANIES

Telecom Network Solutions

Locations

INTERVIEWS

URC Construction

No Interviews

Tell us how to improve this page.

URC Construction Interview Process

based on 62 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

URC Construction Reviews and Ratings

based on 493 reviews

3.5/5

Rating in categories

3.6

Skill development

3.1

Work-life balance

3.1

Salary

3.4

Job security

3.2

Company culture

3.0

Promotions

3.3

Work satisfaction

Explore 493 Reviews and Ratings
Planning Engineer

Bhopal,

Bangalore / Bengaluru

5-10 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
182 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
132 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare URC Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent