Upload Button Icon Add office photos

Filter interviews by

URC Construction Civil Site Engineer Interview Questions and Answers

Updated 23 Jan 2025

URC Construction Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Q2. What are your salary expectations?
  • Q3. Why you last company leave
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the branding sedule and explain
  • Ans. 

    Branding schedule is a plan outlining the timeline and activities for promoting a brand.

    • Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.

    • It helps ensure consistency in brand messaging and image across different platforms and channels.

    • Example: A branding schedule for a new product launch may include market research, l...

  • Answered by AI
  • Q2. Tel me concrete grade and mixing ratio
  • Ans. 

    Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.

    • Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.

    • Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.

    • For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen

  • Answered by AI
  • Q3. How to do LABER maintenance in site
  • Ans. 

    Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.

    • Create a maintenance schedule for all equipment and tools used on site.

    • Check for any signs of wear and tear on equipment and tools.

    • Clean and lubricate equipment regularly to prevent rust and corrosion.

    • Replace any damaged or worn out parts immediately.

    • Train site workers on proper handling and maintenance of e...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for URC Construction Civil Site Engineer interview:
  • Civil Engineering

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering
  • Q2. What is a structure
  • Ans. 

    A structure is a system or arrangement of parts that are interconnected and function together to support loads and resist forces.

    • Structures can be man-made or natural

    • They can be made of various materials such as steel, concrete, wood, etc.

    • Examples include buildings, bridges, dams, towers, etc.

  • Answered by AI
  • Q3. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.

    • Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.

    • Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.

    • Reinforced concrete contains steel reinforcement bars to increase its ...

  • Answered by AI
  • Q4. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures.

    • The mix proportions vary for different grades of concrete t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have confidence

Skills evaluated in this interview

I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. SKILLS REGARDING SITE
  • Q2. SITE KNOWLEDGE, HOW TO HANDLE WORK

Interview Preparation Tips

Interview preparation tips for other job seekers - UPDATE KNOWNLWDGE OF WORKING IDEAS. HOW TO WORK AND MANAGE WORK WORK ON SITE LEVE L

I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M30 concrete
  • Ans. 

    M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.

    • M30 concrete is commonly used in construction projects that require high strength and durability.

    • It is made by mixing cement, sand, and coarse aggregates in a specific ratio.

    • The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.

    • M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.

    • I...

  • Answered by AI
  • Q2. 1 cum rcc weight
  • Q3. What should be the rebar grade
  • Ans. 

    The rebar grade should be selected based on the design requirements and the structural load capacity.

    • The rebar grade is determined by the design engineer based on the structural requirements.

    • The grade of rebar is usually specified in the structural drawings and specifications.

    • The most commonly used rebar grades are 40, 60, and 75.

    • The higher the grade of rebar, the stronger it is and the more load it can bear.

    • The rebar ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always time follow technical specification .

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is ratio of M25 grade
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2.

    • The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for various applications.

    • For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good management system,salary time to time,
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

URC Construction Interview FAQs

How many rounds are there in URC Construction Civil Site Engineer interview?
URC Construction interview process usually has 1-2 rounds. The most common rounds in the URC Construction interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in URC Construction Civil Site Engineer interview?

Some of the top questions asked at the URC Construction Civil Site Engineer interview -

  1. What is the branding sedule and expl...read more
  2. How to do LABER maintenance in si...read more
  3. Tel me concrete grade and mixing ra...read more

Tell us how to improve this page.

URC Construction Civil Site Engineer Interview Process

based on 4 interviews

Interview experience

3.3
  
Average
View more
URC Construction Civil Site Engineer Salary
based on 48 salaries
₹1.9 L/yr - ₹5.4 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

URC Construction Civil Site Engineer Reviews and Ratings

based on 11 reviews

3.9/5

Rating in categories

3.2

Skill development

2.6

Work-life balance

3.2

Salary

3.2

Job security

3.2

Company culture

3.7

Promotions

3.1

Work satisfaction

Explore 11 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
121 salaries
unlock blur

₹3 L/yr - ₹8.9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Civil Site Engineer
48 salaries
unlock blur

₹1.9 L/yr - ₹5.4 L/yr

Explore more salaries
Compare URC Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview