The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
Apco Infratech interview questions for designations
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Top trending discussions
posted on 20 Jun 2024
Stress strain is a measure of the relationship between the force applied to a material and the resulting deformation. Keplar reaction refers to the principle of action and reaction in mechanics.
Stress strain is a measure of how a material deforms under a given load.
Stress is the force applied to a material, while strain is the resulting deformation.
Keplar reaction states that for every action, there is an equal and opp...
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
posted on 17 May 2024
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
based on 4 interviews
1 Interview rounds
based on 21 reviews
Rating in categories
Senior Engineer
134
salaries
| ₹4.2 L/yr - ₹11.1 L/yr |
Assistant Manager
116
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
76
salaries
| ₹5.8 L/yr - ₹18 L/yr |
Civil Site Engineer
69
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure