Filter interviews by
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Top trending discussions
posted on 17 Aug 2024
posted on 14 Dec 2024
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
Technology trends in planning include AI, IoT, data analytics, and cloud computing.
Artificial Intelligence (AI) is being used for predictive analytics and decision-making in planning processes.
Internet of Things (IoT) devices are enabling real-time data collection and monitoring for better planning outcomes.
Data analytics tools are helping planners analyze large datasets to identify trends and patterns for informed dec...
Waterfront development involves creating vibrant, accessible spaces along bodies of water for recreational, commercial, and residential use.
Consider incorporating parks, promenades, and green spaces to enhance public access and enjoyment of the waterfront
Include mixed-use developments with residential, commercial, and recreational components to create a lively and diverse waterfront community
Implement sustainable desig...
posted on 18 Jan 2024
I was interviewed in Feb 2023.
posted on 25 Jun 2024
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
Project operations can be handled effectively by setting clear goals, establishing timelines, assigning tasks, monitoring progress, and adapting to changes.
Set clear goals and objectives for the project
Establish timelines and deadlines for each phase of the project
Assign tasks and responsibilities to team members based on their skills and expertise
Monitor progress regularly to ensure that the project is on track
Adapt t...
posted on 17 Aug 2024
posted on 4 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
General aptitude of IQ
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every...
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such ...
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of c
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure project
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
Power formula is P = VI, where P is power, V is voltage and I is current.
Power formula is used to calculate the power consumed by an electrical device.
P = VI, where P is power, V is voltage and I is current.
Power is measured in watts (W), voltage in volts (V) and current in amperes (A).
The formula can be rearranged to find any of the three variables.
For example, if the voltage and current are known, the power can be ca
Electrical products refer to devices that use electricity to perform a specific function.
There are various types of electrical products such as lighting fixtures, appliances, power tools, and electronic devices.
Lighting fixtures include bulbs, lamps, and fixtures for indoor and outdoor use.
Appliances include refrigerators, washing machines, and air conditioners.
Power tools include drills, saws, and sanders.
Electronic d...
posted on 27 Feb 2024
based on 8 reviews
Rating in categories
Senior Engineer
133
salaries
| ₹4.2 L/yr - ₹11.1 L/yr |
Assistant Manager
126
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Structural Engineer
94
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
83
salaries
| ₹7 L/yr - ₹18.5 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure