Upload Button Icon Add office photos

Apco Infratech

Compare button icon Compare button icon Compare

Filter interviews by

Apco Infratech Electrical Engineer Interview Questions and Answers

Updated 9 Jan 2024

Apco Infratech Electrical Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is moter and it capacity
  • Ans. 

    A motor is a device that converts electrical energy into mechanical energy to perform work.

    • Motors are commonly used in various applications such as electric vehicles, industrial machinery, and household appliances.

    • They come in different types such as AC motors, DC motors, and stepper motors.

    • Motor capacity refers to its power rating, typically measured in horsepower (HP) or kilowatts (kW).

    • Higher capacity motors can gene...

  • Answered by AI
  • Q2. Moter is a mechanical part which convert electrical energy in to mechanical energy
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Am handling all electrical equipment l2d boomer concrete pump bantching plan Dewatering cff2 cff3 shot creat machin
  • Q2. Am handling all electrical equipment l2d boomer concrete pump bantching plan Dewatering cff2 cff3 shot creat machin &Dewarting air pipe line

Interview Preparation Tips

Interview preparation tips for other job seekers - I am handling all electrical equipment l2d boomer concrete pump bantching plan Dewatering cff2 cff3 shot creat machin

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ... read more
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. 1.what is composite error and ratio error in current transformer?
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformer according to voltage transfer

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ammonia process
Round 3 - HR 

(2 Questions)

  • Q1. How much salary expectations?
  • Q2. Salary Negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best

I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self
  • Ans. I had answered my family background and my experience
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview was held in Bombay.Basically I had prepared for the interview with relate my technical question and my experience related question.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star

Apco Infratech Interview FAQs

How many rounds are there in Apco Infratech Electrical Engineer interview?
Apco Infratech interview process usually has 1-2 rounds. The most common rounds in the Apco Infratech interview process are Technical and Resume Shortlist.
How to prepare for Apco Infratech Electrical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Apco Infratech. The most common topics and skills that interviewers at Apco Infratech expect are Electrical Engineering, Electrical Maintenance and Electricals.
What are the top questions asked in Apco Infratech Electrical Engineer interview?

Some of the top questions asked at the Apco Infratech Electrical Engineer interview -

  1. What is moter and it capac...read more
  2. am handling all electrical equipment l2d boomer concrete pump bantching plan De...read more
  3. Moter is a mechanical part which convert electrical energy in to mechanical e...read more

Tell us how to improve this page.

Apco Infratech Electrical Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Apco Infratech Electrical Engineer Salary
based on 10 salaries
₹4.8 L/yr - ₹6.5 L/yr
6% more than the average Electrical Engineer Salary in India
View more details

Apco Infratech Electrical Engineer Reviews and Ratings

based on 4 reviews

4.3/5

Rating in categories

3.8

Skill development

4.2

Work-life balance

4.2

Salary

4.0

Job security

4.1

Company culture

4.6

Promotions

3.8

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
141 salaries
unlock blur

₹5.2 L/yr - ₹15.5 L/yr

Senior Engineer
135 salaries
unlock blur

₹4.2 L/yr - ₹11.4 L/yr

Site Engineer
96 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Deputy Manager
82 salaries
unlock blur

₹7 L/yr - ₹18 L/yr

Store Officer
76 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Apco Infratech with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Saipem

4.1
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview