Filter interviews by
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
Estimation of a small building.
The ratio of block work motor to plastering motor is typically 1:3.
The ratio of block work motor to plastering motor is usually 1:3.
This means for every 1 part of block work motor, 3 parts of plastering motor are used.
The ratio may vary depending on the specific project requirements.
The productivity of a laborer can be calculated by the amount of work completed in a day.
Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.
Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.
Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.
Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.
Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.
The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.
Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr
Density of materials is a measure of how much mass is contained in a given volume.
Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).
Materials with higher density have more mass packed into a given volume.
Common examples of materials with high density include metals like lead and gold.
Materials with low density include gases like helium and liquids like oil.
Top trending discussions
posted on 13 Sep 2022
posted on 2 Feb 2022
I applied via Approached by company and was interviewed in Jan 2022. There were 4 interview rounds.
Engineering paper of concrete related and other subjects.
I was interviewed in Feb 2023.
Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.
Identify needs and requirements
Research and select potential suppliers
Negotiate terms and conditions
Create and sign contracts
Manage supplier relationships and performance
Monitor and evaluate procurement process effectiveness
Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.
Communicate openly and honestly with colleagues and superiors
Respect confidentiality and avoid gossip or spreading rumors
Follow through on commitments and hold yourself accountable
Act with fairness and impartiality in decision-making
Admit mistakes and take responsibility for correcting them
Lead by example and
posted on 7 Aug 2024
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
I have always been fascinated by the process of creating something tangible from scratch and the satisfaction of seeing a project come to life.
Enjoy working with my hands and seeing tangible results
Passionate about creating and building things
Interested in the technical aspects of construction projects
Excited about the challenges and problem-solving opportunities in the field
My skills in leadership, problem-solving, and communication make me a strong match for the Assistant Manager role.
Strong leadership skills demonstrated through previous experience managing a team of employees
Proven ability to solve complex problems efficiently and effectively
Excellent communication skills, both written and verbal, essential for coordinating with team members and upper management
I am an avid traveler and have visited over 20 countries.
I love experiencing new cultures and trying different cuisines.
Traveling has taught me to be adaptable and open-minded.
One of my favorite trips was to Japan, where I explored Tokyo and Kyoto.
posted on 31 Jan 2023
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 26 Nov 2022
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
based on 42 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
125
salaries
| ₹3 L/yr - ₹8.9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Assistant Manager
48
salaries
| ₹4 L/yr - ₹9.9 L/yr |
Civil Site Engineer
48
salaries
| ₹1.9 L/yr - ₹5.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group