B. G. Shirke Construction Technology Assistant Engineer Interview Questions and Answers

Updated 22 Jan 2025

B. G. Shirke Construction Technology Assistant Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Related to site engineer
  • Q2. RCC, concrete,and other

Interview Preparation Tips

Interview preparation tips for other job seekers - RCC, CONCRETE, PRECAST..ETC

I applied via Approached by company and was interviewed in Jan 2022. There were 4 interview rounds.

Round 1 - Aptitude Test 

Engineering paper of concrete related and other subjects.

Round 2 - Technical 

(1 Question)

  • Q1. Technical round about experience of execution and some standards and procedures.
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical round and execution difficulties, problem solving and some rate analysis regarding.
Round 4 - HR 

(5 Questions)

  • Q1. Share details of your previous job.
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Why are you looking for a change?
  • Q5. What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and thorough knowledge of execution from foundation to finishing works. Communication must be very good and interesting to the interviewer.

Assistant Engineer Interview Questions Asked at Other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete ... read more
asked in Randstad
Q2. 1.Define the term capacitance & inductance 2.what is Rectifie ... read more
Q3. How do we take slump for casting of concrete and what if when we ... read more
asked in TCE
Q4. What are the provisions you check for, designing a beam/column ac ... read more
Q5. What is the 5s.and how is the important of a industry??

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is height of instrument
  • Ans. 

    Height of instrument is the vertical distance between the instrument and a reference point on the ground.

    • It is used in surveying to determine the elevation of points on the ground.

    • It is measured using a leveling instrument such as a level or a theodolite.

    • The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.

    • It is important to maintain a consistent heig...

  • Answered by AI
  • Q2. What should be the size of spacer bar
  • Ans. 

    The size of spacer bar depends on the size of the conductor and the voltage rating of the line.

    • The size of the spacer bar should be such that it maintains the required distance between the conductors.

    • The size of the spacer bar should be selected based on the voltage rating of the line.

    • The size of the spacer bar should be selected based on the size of the conductor.

    • The size of the spacer bar should be such that it can w...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give special attention towards technical aspects and on structural analysis.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how road was construted
  • Ans. 

    Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.

    • Planning: Determine the route, traffic flow, and necessary permits.

    • Designing: Create detailed plans including width, materials, and drainage systems.

    • Clearing the land: Remove trees, rocks, and other obstacles.

    • Laying the foundation: Level the ground, add layers of gravel ...

  • Answered by AI
  • Q2. Tell me all technical specification about Sub grade to Wearing course.
  • Ans. 

    Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.

    • Material type for sub grade can be natural soil, stabilized soil, or aggregate base.

    • Thickness of sub grade is typically specified based on soil conditions and traffic loads.

    • Compaction requirements ensure proper density and strength of the sub grade.

    • Wearing course materials can incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job interview was not very hard.Actually they want candidates... Because everyone knows about their salary delay of 5-6 months.

Interview Questionnaire 

1 Question

  • Q1. Work experience questions first preference

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical Interview depends upon work experience,IS codes and software skills etc.

I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
  • Ans. 

    Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.

    • Taking multiple samples would increase the cost of testing.

    • The strength of concrete is usually consistent within a small volume.

    • ASTM C31 allows for only 1 set of samples for small volume concrete.

    • If the first set of samples fails, additional samples can be taken for verification.

  • Answered by AI
  • Q2. How do we take slump for casting of concrete and what if when we go rise about 50 meter height ...is their any difference in slump value as we go rise or in high rise buildings
  • Ans. 

    Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.

    • Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.

    • As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.

    • To maintain the desire...

  • Answered by AI
  • Q3. What if we r doing a casting of concrete and in the meantime rain comes and continue for 2 days what would be the right bonding agent for recasting of concrete
  • Ans. 

    The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.

    • The surface should be cleaned and dried before applying the bonding agent.

    • The bonding agent should be applied in a thin layer using a brush or roller.

    • The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.

    • Examples of polymer-modified cementitio...

  • Answered by AI
  • Q4. Shear force and bending moment description and calculation..
  • Ans. 

    Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.

    • Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.

    • Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.

    • Shear force and bending moment diagrams are used to visualize the distribution of these forces...

  • Answered by AI
  • Q5. CMDI AND HDPE DIFFERENCE
  • Ans. 

    CMDI and HDPE are two different types of plastic materials used in various applications.

    • CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.

    • HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.

    • CMDI has better resistance to chemica...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go for it u will succeed and have confidence ...confidence makes ur interview better......

I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS regarding pile cap, pier, and quality related questions I.e about steel and concrete.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in Confidence and hv command on your previous years experience.

Interview Questionnaire 

1 Question

  • Q1. What is your current salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Simply discussed about salary
  • Q2. Some fields related questions

I applied via Company Website and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

An written test conducted. Technical questions asked

Round 3 - Technical 

(2 Questions)

  • Q1. Higher authorities took interview and asked few questions related to technical knowledge
  • Q2. What is minimum cement used for M30 grade of concrete. Answer is 320 kg
  • Ans. 

    Minimum cement required for M30 grade of concrete is 320 kg.

    • M30 grade of concrete requires a minimum cement content of 320 kg/m3

    • The cement content may vary based on factors such as water-cement ratio, aggregate type, and quality of cement used

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - study IS 456 thouroughly and you can answer for many questions

B. G. Shirke Construction Technology Interview FAQs

How many rounds are there in B. G. Shirke Construction Technology Assistant Engineer interview?
B. G. Shirke Construction Technology interview process usually has 2-3 rounds. The most common rounds in the B. G. Shirke Construction Technology interview process are Technical, Aptitude Test and One-on-one Round.
How to prepare for B. G. Shirke Construction Technology Assistant Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B. G. Shirke Construction Technology. The most common topics and skills that interviewers at B. G. Shirke Construction Technology expect are CTO, Defect Prevention, Environment, Environment Management and Environmental Audit.
What are the top questions asked in B. G. Shirke Construction Technology Assistant Engineer interview?

Some of the top questions asked at the B. G. Shirke Construction Technology Assistant Engineer interview -

  1. Technical round and execution difficulties, problem solving and some rate analy...read more
  2. RCC, concrete,and ot...read more
  3. Related to site engin...read more

Tell us how to improve this page.

B. G. Shirke Construction Technology Assistant Engineer Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more
B. G. Shirke Construction Technology Assistant Engineer Salary
based on 90 salaries
₹3.5 L/yr - ₹7.8 L/yr
27% more than the average Assistant Engineer Salary in India
View more details

B. G. Shirke Construction Technology Assistant Engineer Reviews and Ratings

based on 21 reviews

4.3/5

Rating in categories

4.0

Skill development

4.4

Work-life balance

3.9

Salary

4.5

Job security

4.3

Company culture

3.8

Promotions

3.9

Work satisfaction

Explore 21 Reviews and Ratings
Junior Engineer Civil
316 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
176 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
90 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
88 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
75 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B. G. Shirke Construction Technology with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview