I applied via Approached by company and was interviewed in Jan 2022. There were 4 interview rounds.
Engineering paper of concrete related and other subjects.
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
posted on 15 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
Height of instrument is the vertical distance between the instrument and a reference point on the ground.
It is used in surveying to determine the elevation of points on the ground.
It is measured using a leveling instrument such as a level or a theodolite.
The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.
It is important to maintain a consistent heig...
The size of spacer bar depends on the size of the conductor and the voltage rating of the line.
The size of the spacer bar should be such that it maintains the required distance between the conductors.
The size of the spacer bar should be selected based on the voltage rating of the line.
The size of the spacer bar should be selected based on the size of the conductor.
The size of the spacer bar should be such that it can w...
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 17 Sep 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.
Taking multiple samples would increase the cost of testing.
The strength of concrete is usually consistent within a small volume.
ASTM C31 allows for only 1 set of samples for small volume concrete.
If the first set of samples fails, additional samples can be taken for verification.
Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.
Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.
As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.
To maintain the desire...
The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.
The surface should be cleaned and dried before applying the bonding agent.
The bonding agent should be applied in a thin layer using a brush or roller.
The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.
Examples of polymer-modified cementitio...
Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.
Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.
Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.
Shear force and bending moment diagrams are used to visualize the distribution of these forces...
CMDI and HDPE are two different types of plastic materials used in various applications.
CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.
HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.
CMDI has better resistance to chemica...
posted on 21 Jul 2021
posted on 27 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining tower locations, conductor size, and insulator type.
Material procurement involves sourcing towers, conductors, insulators, and hardware.
Site prepar...
posted on 4 Dec 2024
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
posted on 19 Jun 2024
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.
Piling involves driving long, slender columns (piles) into the ground to provide support for structures.
The process starts with site investigation to determine soil conditions and load-bearing capacity.
Piles can be made of concrete, steel, or timber, depending on the project requirements.
Piles are driven ...
BBS preparation involves calculating quantities of steel reinforcement required for construction projects.
Start by studying the structural drawings and specifications provided
Identify the different structural elements like beams, columns, slabs, etc.
Calculate the total length of each type of reinforcement required
Use standard formulas and codes to determine the quantity of steel bars needed
Prepare a detailed Bill of Qu...
based on 2 interviews
Interview experience
based on 21 reviews
Rating in categories
Junior Engineer Civil
316
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company