Filter interviews by
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 21 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
Estimation of a small building.
The ratio of block work motor to plastering motor is typically 1:3.
The ratio of block work motor to plastering motor is usually 1:3.
This means for every 1 part of block work motor, 3 parts of plastering motor are used.
The ratio may vary depending on the specific project requirements.
The productivity of a laborer can be calculated by the amount of work completed in a day.
Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.
Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.
Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.
Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.
Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.
The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.
Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr
Density of materials is a measure of how much mass is contained in a given volume.
Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).
Materials with higher density have more mass packed into a given volume.
Common examples of materials with high density include metals like lead and gold.
Materials with low density include gases like helium and liquids like oil.
based on 4 interviews
Interview experience
based on 44 reviews
Rating in categories
Assistant Engineer
148
salaries
| ₹3 L/yr - ₹6 L/yr |
Senior Engineer
137
salaries
| ₹3 L/yr - ₹10 L/yr |
Junior Engineer
81
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
50
salaries
| ₹2.6 L/yr - ₹5.6 L/yr |
Senior Civil Engineer
50
salaries
| ₹4 L/yr - ₹8.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem